NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Safety and Health of Operators at Ground Zero, article

Machine-extracted title · confidence 50%

Journal article on worker safety at Ground Zero, focusing on air samples and protection.

NYC-WTC_000290266–000290269
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Safety and Health of lUOE Workers at Ground Zero 541

saying “Our tests show that it is safe for New Yorkers to go “ During a meeting of the British Asbestos Research Council back to work in New York’s Financial District” [OSHA, in London, in the 1960s, the technician who was in charge of 2001, Sept. 14]. The release further indicated that, “new counting fibres in the microscope commented that it was samples confirm previous reports that ambient air quality difficult, and that it was easier if only fibres longer than 5 pm meets OSHA standards and consequently is not a case for were counted. From that time, simply from this statement, the public concern. New OSHA data also indicate that indoor air 5 pm length limit was established” [Ontario Research quality in downtown buildings will meet standards.” Foundation, 1985J. The OSH A asbestos standard has never been applicable to ambient air quality, and was particularly inappropriate for the World Trade Center. The incredible force of the destruc­ DISCUSSION tion pulverized the sprayed-on insulation, releasing asbestos fibers that were mostly less than the OSHA cut-off of 5.0 pm Safety and health professionals worked long and dili­ in length and below 0.25 pm in width, which is widely gently to ensure the workers at the site were protected but regarded as the limit of resolution for optical microscopy. were hampered by not only the pace and difficulty of the Ninety-five percent of the asbestos fibers observed with cleanup but also by the complexity of the lines of authority. TEM, in eleven samples collected inside buildings near Participants at the December 2001 NIOSH conference on Ground Zero shortly after the destruction were reported as worker safety at the WTC noted “the lack of a clear com- below the width visible to optical microscopy [Granger et al., mand structure at the World Trade Center (site) thwarted 2001]. Four days after the OSHA pronouncement of accep- efforts to enforce PPE (personal protective equipment) use table air quality, one of the most respected electron micro- and risk-reduction behaviors.” They repeatedly expressed scopists in North America ran samples inside an apartment the “need to rapidly establish a single controlling authority or building near Ground Zero and reported elevated results, one unified command” [Jackson et al., 2002]. as high as 3.74 structures/cm^ of air, 37 times greater than the OSHA has been criticized for not enforcing the agency’s OSHA standard [Chatfield and Kominsky, 2001]. standards at Ground Zero but under the Federal Response Sixty percent of the samples collected by the lUOE Plan—the blueprint for coordinating and applying the inside heavy equipment cabs were greater than the EPA resources of the federal government to any disaster beyond clearance criteria of 0.01 structures/cm^ of air, when count- the capabilities of an individual state—OSHA’s role is clearly ing fibers greater than 0.5 pm in length. Almost none of the one of consulting to the Federal Emergency Management fibers were greater than the OSHA cut-off. The approach of Agency (FEMA). From the plan, OSHA’s support “may the lUOE team was to assume that shorter libers, if not as include safety consultation and training programs, air con- hazardous, still posed potential risks. taminant sampling and analysis, and other safety services OSHA has maintained that the 5.0-pm cutoff is based preparatory to, during, and/or following disaster operations solely on health concerns, but a far different perspective is under the FRP [Federal Emergency Management Agency, provided in the proceeding.s from a 1984 international con- 1999].” ference of asbestos experts held in Toronto. When asked The difficulties noted above manifested themselves as whether fibers longer than 5 pm were being chosen because delays in critical safety and health activities. As Figure 2 of “biological effects or just for the convenience of the indicates, respirator fit tests were not offered widely onsite analytical method alone,” Patrick Sebastien responded that until October 17, thirty-six days after the attack. The safety

Terrorist attack 0

Fit tests offered widely onsite 36

Issuance of S&H plan 48

First formal training onsite <8

0 20 40 60 80 100 Days after attack

FIGURE 2. EventstimelineafterWorldTraCeCenterAtteck

CITY_21MC100_011200050

NYC-WTC_000290268

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290268Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000289538

A publication discussing safety and health of WTC operators and related air samples.

Similar indexed content

Compare copies and versions →