NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Ground Zero air quality article, Am J Ind Med

Machine-extracted title · confidence 18%

A publication discussing safety and health of WTC operators and related air samples.

NYC-WTC_000289538–000289541
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Safety and Health of lUOE Workers at Ground Zero 541

saying "Our tests show that it is safe for New Yorkers to go “During a meeting of the British Asbestos Research Council back to work in New York’.s Financial District” [OSHA. in London, in the 1960s, the technician who was in charge of 2001. Sept. 14]. Tlte release further indicated that, “new counting fibres in tire microscope commented tliat it was samples confirm previous reports that ambient air quality difficult, and that it was easier if only fibres longer than 5 pm meets O.SHA standards and consequently is not a case for were counted. From that time, simply from this statement, the public concern. New OSHA data also indicate that indoor air 5 pm length limit was established” [Ontario Research quality in downtown buildings will meet standards.” Foundation, 1985]. The OSHA asbestos standard has never been applicable to ambient air quality, and was particularly inappropriate for the World Trade Center. The incredible force of the destnic- DISCUSSION tion pulverized the sprayed-on insulation, releasing asbestos fibers that were mostly less titan the OSHA cut-off of 5.0 pm Safety and health professionals worked long and dili­ in length and below 0.25 pm in width, which is widely gently to ensure the workers at the site were protected but regarded as the limit of resolution for optical microscopy. were hatnpered by not only the pitce and difficulty of the Ninety-live percent of the asbestos fibers observed with cleanup but also by tire complexity of the lines of authority. TEM, in eleven samples collected inside buildings ncai' Participants at the December 2001 NIOSH conference on Ground Zero shortly after the destruction were reported as worker safety at the WTC noted “the lack of a clear com­ below the width visible to optical microscopy [Granger et al., mand structure at the World Trade Center (site) thwaned 2001]. Four days after the OSHA pronouncement of accep­ efforts to enforce PPE (personal protective equipment) use table air quality, one of the most respected electron micro­ and risk-reduction behaviors.” Tliey repeatedly expressed scopists in North America ran samples inside an apartment the “need to rapidly establish a single controlling authority or building near Ground Zero and reported elevated results, one unified command" [Jackson et al., 2002]. as high as 3.74 structures/cm ’ of air, 37 times greater than the OSHA has been criticized fornot enforcing the agency’.s OSHA standard [Chatfield and Kominsky, 2001]. standards at Ground Zero but under the Federal Response Sixty percent of the samples collected by the IDOE Plan—the blueprint for coordinating and applying the inside heavy equipment cabs were greater than the EPA resources of the federal government to any disaster beyond clearance criteria of 0.01 structures/cm’ of air, when count­ the capabilities of an individual state—OSHA’s role is clearly ing fibers greater ihan 0.5 pm in length. Almost none of the one of consulting to the Federal Emergency Management fibers were greater tlian the OSHA cut-off. The approach of Agency (FEMA). From the plan, OSHA's support “may the lUOE team was to assume that shorter fibers, if not a.s include safety consultation and training programs, aircon- hazardous, still posed potential risks. taminant sampling and analysis, and other safety services OSHA has maintained that the 5.0-pra cutoff is based preptrratory to. during, and/or following disaster operations solely on health concerns, but a fai- different perspective i.s under the FRP [Federal Emergency Management Agency, provided in the proceedings from a 1984 international con- 19991.” ference of asbestos experts held in Toronto. When asked The difficulties noted above manifested themselves as whetlier fibers longer than 5 pm were being chosen because delays in critical safety and health activities. As Figure 2 of “biological effects or just for the convenience of the indicates, respirator fit tests were not offered widely onsite analytical method alone,” Patrick Sebastien responded that until October 17, thirty-six day.s after the attack. The safety

Terrorist attack 0

Fit tests offered widely onsite 35

Issuance of S&H plan 48

First formaltraining onsite

0 20 40 B 60 80 f8

100 Days after attac k

FIGURE 2. EventslimelinealterWorldTiadeCeiitefAttack.

CITY_21MC100_012182097

NYC-WTC_000289540

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000289540Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →