NYC 9/11 Public Portal Document
o All 10 samples analyzed did not detect any PCBs.
NYC / ER (Mar 7) - PCBs
o All 10 samples analyzed did not detect any PCBs.
NYC / ER (Mar 3 - 4) - Asbestos Monitoring (Particulate Monitoring Stations)
o Monitoring sites include:
Park Row (Site 1)
Chambers St ./West St. (Site 2)
Public School 154: 333 East 135* St. Bronx (Site 5)
Intermediate School 143: 511 West 182"^* St.. Manhattan (Site 6)
Public School 274: 800 Bushwick Ave.. Brooklyn (Site 7)
Public School 44; 80 Maple Parkway. Staten Island (Site 8)
Public School 199: 3290 - 48* Ave.. Queens (Site 9)
o During this period a total of 14 samples were collected from these monitoring
sites.
o All of the samples were below the TEM AHERA standard.
NYC / ER (Mar 5 - 6) - Asbestos Monitoring (Particulate Monitoring Stations)
o Results pending.
NYC / ER (Mar 14) - Particulate Monitoring (Dataram)
o Particulate levels noted at three locations (Stations L, N, and R) were below the
OSHA TWA
o Instruments operated approximately 8 hours, except for Location N, which
operated approximately 516 hours.
o Station L had an average of 57.49 ug/m’ with a maximum reading of 120.63
ug/m^
o Station N had an average of 42.73 ug/in’ with a maximum reading of 92.76 ug/m^
o Station R had an average of 55.57 ug/m^ with a maximum reading of
120.54 ug/m’.
NYC / ER (Mar 15) - Particulate Monitoring (Dataram)
o Particulate levels noted at three locations (Stations L, N, and R) were below the
OSHA TWA.
o Instruments operated approximately 8 hours.
o Station L had an average of 125.99 ug/m^ with a maximum reading of
170.65 ug/m’.
o Station N had an average of 121.01 ug/in’ with a maximum reading of
191.41 ug/m’.
o Station R had an average of 112.83 ug/m’ with a maximum reading of
CITY_21MC100_002417034
NYC-WTC_000287264
OCR can misread numbers and units. Confirm readings against the page image before using them.