NYC-WTC_000348225
Air monitoring log form for project turnaround site; chain-of-custody maintained.
1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗Air monitoring log sheet and chain-of-custody form for JVC project at 228 East 45th Street.
NYC-WTC_000284229OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
.228 fc'ssl 45tti Street New York, NY 10017 (212) 922-W77 RO. Fax (212) 522-0820 WARREN & PANZER ENGINEERS, P.C. AIR MONITOSING LOG SHEBT/CHAtN-OF-CUSTODY FORM
CLIENT: hJVC W&PFILE/y: >O~m-Oil - diY. Analysis Method: PCM - 7400 PROJECT: ar pAQrdL PL, TURNAROUND: oM (circia one) (TEM - AHE^ LOCATION: TWAbE TECHNICIAN; A, TEM-EPRTEVELil
iSi Sample PUMP FLOWRATE TIME :< ■ - tWAl;' ■'
Y; DESCRIPTION/LOGATION START STOP LLON Y^L-'QFP U{lite%O:(fiK/cc^' (JC»/fTA6lb ■3 e.o e.o iMOa. nox IW 1‘iKO
KlOOt^ tfF TPCApt?' 3 6.0 moH noi/ il?r~ J__ 14'14I 8.0 iMcj7 1^0 3 / B3 t-
) Q SAMPLED BY: R. DATE; U4f-41 H
SIGNATURE: 1 - Blank 5 - Final Clearance (Inside) I—i
os RELEASED 8Y: DATE: 2 - Pre-Abatemenl 6 - Final Clearance (outside) o o SIGNATURE: 3 “ During Abatemeni 7 - Personal I o o RECEIVED BY: DATE: 4 - During Giove Bag Removal 8 ~ Background CY, (JI SIGNATURE: 2z;c<? EFE RCV£RSL SIDE FOR AMALYGI6 irtFORUATION
NYC-WTC_000284229
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000348225
Air monitoring log form for project turnaround site; chain-of-custody maintained.
1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000187170
Warren & Panzer Engineers log sheet documenting air sampling parameters and chain of custody for PCM analysis.
1 shared topics · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348132
Air monitoring log sheet/chain-of-custody form for Warren & Panzer Engineers; includes client and project identifiers.
1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348147
Chain-of-custody log for air sampling at NYC site (TEM/AHERA).
1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348173
Lab report for MMC air analysis; AHERA/EP Level II testing mentioned.
1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348134
Air monitoring log sheet and chain-of-custody form detailing sample start/stop times and volumes.
1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282791
Air monitoring log and chain-of-custody form for WFC South Tower sampling, 2002.
1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284231
Air monitoring log sheet for PCM-7400 analysis; location listed as FewP, technician noted.
1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000344089
Air monitoring log with PCM/TEM analysis details and chain-of-custody.
1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000357587
Air monitoring log sheet and custody form for project samples at 45th Street office.
1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356824
Chain-of-custody form for air monitoring at a NYC DDC site, with client details blurred.
1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000348225
Air monitoring log form for project turnaround site; chain-of-custody maintained.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000345058
Air monitoring log/chain-of-custody form for PCM analyses; location and times documented.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000187170
Warren & Panzer Engineers log sheet documenting air sampling parameters and chain of custody for PCM analysis.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348132
Air monitoring log sheet/chain-of-custody form for Warren & Panzer Engineers; includes client and project identifiers.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348147
Chain-of-custody log for air sampling at NYC site (TEM/AHERA).
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283827
Air Monitor log and chain-of-custody for PCM analysis, with timing details.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000348225
Air monitoring log form for project turnaround site; chain-of-custody maintained.
Similar indexed content
NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
Similar indexed content
NYC-WTC_000187170
Warren & Panzer Engineers log sheet documenting air sampling parameters and chain of custody for PCM analysis.
Similar indexed content
NYC-WTC_000348132
Air monitoring log sheet/chain-of-custody form for Warren & Panzer Engineers; includes client and project identifiers.
Similar indexed content
NYC-WTC_000348147
Chain-of-custody log for air sampling at NYC site (TEM/AHERA).
Similar indexed content