NYC-WTC_000283881
Letter regarding roofing-cleaning project; final clearance air sample results and re-occupancy.
3 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Letter regarding TEM air sample results after roofing-cleaning abatement at 57 [name], final clearance achieved.
NYC-WTC_000283884
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Warren & Panzer Engineers, P.C. 228 East 45th Street New York, New York 10017 'lei, (212) 922-0077 Fax (212) 922-0630
July 1,2002
Mr. Leonard G. Atteloney New York City Department of Environmental Protection 96-05 Horace Harding Expressway Corona, NY 11368
Re: Final Clearance TEM Air Sample Results
W&PFile#: 1079.01.02
Dear Mr. Atteloney:
On June 10,2002, a roofing-cleaning project was completed at the building located at 57 Ann Street. Transmission Electron Microscopy air samples were collected at the completion of the abatement work. Final clearance air samples collected met the clearance criteria of less than 70 Structures per square millimeter set forth by the NYS Department of Labor Industrial Code Rule 56 and the NYC Department of Environmental Protection Title 15, Chapter 1 Asbestos Rules and Regulations, and this area can now be re-occupied.
Along with this correspondence, I have enclosed a copy of the final visual inspection checklist. If you have any questions or should you need additional information, please contact me at (212) 922- 0077.
Sincerely,
WARREN «& PANZER ENGINEERS, P.C.
Michael R. Nolan Senior Project Manager
cc: Krish Radhakrishnan, PE Attachment(s)
.4 Member of The Warren & Panzer Group
CITY_21MC100_002964955
NYC-WTC_000283884
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000283881
Letter regarding roofing-cleaning project; final clearance air sample results and re-occupancy.
3 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283883
Correspondence about TEM air samples from roofing-cleaning abatement at 49 A [name], final clearance achieved.
3 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283882
Memorandum re: TEM air sample results from roofing-cleaning abatement at 49 [name], with final clearance and enclosure of inspection checklist.
3 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283930
Final clearance air samples met criteria; area re-occupied after roofing/façade work at 55 [name].
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283921
TEM air sampling after cleaning; final clearance achieved.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283929
Final clearance air samples met criteria; area re-occupied after roofing/façade cleaning at 22-24 [name].
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283915
TEM air sampling after roofing-cleaning; final clearance criteria met.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283895
July 31, 2002 correspondence on TEM air samples at 176 Broadway; final clearance criteria met.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283918
Air samples after roofing-cleaning; final clearance satisfied.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283917
Microscopy air samples post-abatement; final clearance achieved.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283920
Final TEM air samples; area cleared for occupancy.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283942
Correspondence transmitting TEM air sample results and final visual inspection checklist for a Murray Street roofing/ façade cleaning project.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000119704
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos removal work completed at 57 Ann Street in November 2002.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283881
Letter regarding roofing-cleaning project; final clearance air sample results and re-occupancy.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283883
Correspondence about TEM air samples from roofing-cleaning abatement at 49 A [name], final clearance achieved.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283882
Memorandum re: TEM air sample results from roofing-cleaning abatement at 49 [name], with final clearance and enclosure of inspection checklist.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119534
Invoice from Kurzban & Son Control Inc. for roof asbestos removal work completed at 49 Ann Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127880
Invoice from Benjamin Kurzban & Son Control Inc. for roof decontamination work at 125 Fulton Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000283881
Letter regarding roofing-cleaning project; final clearance air sample results and re-occupancy.
Similar indexed content
Correspondence about TEM air samples from roofing-cleaning abatement at 49 A [name], final clearance achieved.
Similar indexed content
Memorandum re: TEM air sample results from roofing-cleaning abatement at 49 [name], with final clearance and enclosure of inspection checklist.
Similar indexed content
Final clearance air samples met criteria; area re-occupied after roofing/façade work at 55 [name].
Similar indexed content
NYC-WTC_000283921
TEM air sampling after cleaning; final clearance achieved.
Similar indexed content