NYC-WTC_000342494
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
13 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Pre-bid meeting notice and follow-up for 114 Liberty Street, interior cleaning monitoring.
NYC-WTC_000282464–000282470OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Project Monitorins
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work imtil corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 7 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
6 of? 2/7/03
CITY_DEP_WORBY_CANNATA_SUBP_000005778
NYC-WTC_000282469
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000342494
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
13 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342487
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209406
Document outlining a mandatory pre-bid meeting and scope of work for asbestos abatement and cleaning at 114 Liberty Street in February 2003.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342501
Pre-bid meeting notice and background on interior cleaning and monitoring for WTC site work.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282430
Chain-of-custody/meeting notes for WTC-LBA project; pre-bid site walkthrough and background.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206797
Contract scope detailing mandatory pre-bid meeting and requirements for licensed contractors to clean and monitor asbestos at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362702
Chain-of-custody entry referencing a pre-bid meeting and building walkthrough for WTC-LBA scope.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282437
Background and plan for on-site asbestos monitoring during interior cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279027
Bid items and labor rates for air monitoring and TEM/PCM analysis.
13 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279035
Background on cleaning scope and on-site monitoring for asbestos abatement at 114 Liberty.
13 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362669
Document outlining mandatory pre-bid meeting and scope for interior asbestos cleaning and air monitoring at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342508
Document outlining mandatory pre-bid meeting and scope for interior asbestos cleaning and air monitoring at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342487
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282437
Background and plan for on-site asbestos monitoring during interior cleaning at 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342501
Pre-bid meeting notice and background on interior cleaning and monitoring for WTC site work.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206797
Contract scope detailing mandatory pre-bid meeting and requirements for licensed contractors to clean and monitor asbestos at 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000342494
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
Similar indexed content
NYC-WTC_000342487
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
Similar indexed content
NYC-WTC_000209406
Document outlining a mandatory pre-bid meeting and scope of work for asbestos abatement and cleaning at 114 Liberty Street in February 2003.
Similar indexed content
NYC-WTC_000342501
Pre-bid meeting notice and background on interior cleaning and monitoring for WTC site work.
Similar indexed content
NYC-WTC_000282430
Chain-of-custody/meeting notes for WTC-LBA project; pre-bid site walkthrough and background.
Similar indexed content