NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
16 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
NYC-WTC_000265735–000265744OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Project Monitorine
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4, A final report shall be submitted to the DEP within days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_21MC100_009369650
NYC-WTC_000265743
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
16 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282507
Draft scope detailing on-site air monitoring and clearance sampling requirements.
14 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307885
Mandatory pre-bid for 125 Cedar Street WTC cleanup; overview of asbestos sampling and monitoring.
14 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
16 shared non-person entities · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
16 shared non-person entities · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
14 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160622
Internal review request for FEMA mission assignment proposal.
6 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
5 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160896
Inquiry regarding an asbestos addendum and scope of work document circulated by the EPA for World Trade Center cleanup.
6 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152149
A fax cover sheet from the Department of Environmental Protection dated September 19, 2001.
6 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000282464
Pre-bid meeting notice and follow-up for 114 Liberty Street, interior cleaning monitoring.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163439
Document recording the chain of custody for environmental monitoring samples collected at 125 Cedar Street in October 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281926
Proposed on-site asbestos cleaning oversight and air monitoring requirements.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
Similar indexed content
NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
Similar indexed content
NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similar indexed content
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
Similar indexed content