NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, WTC site

Machine-extracted title · confidence 50%

Daily workforce report listing personnel and equipment for World Trade Center project.

NYC-WTC_000281690
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whiiestc e, N.Y. 11357-(718) 767-9000 DATE: NOVEMBERS, 2001 ) FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 . 'PROJECT ENGINEER 1 CAT 446 BACKHOE 1 .OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 'laborers HITACHI 750 GRAPPLER i IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 3 MECHANICS TRUCK 2 TEAMSTERS 13 TOOL TRUCK 2 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 3 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK 1 3 TICKETS AWISCO FUEL TRUCK 1 2 LOADS MILLINGS IN PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK PUMP 2

Description of Work:___________________ i_________________________ _ ________________________ 2 HOUR DELAY DUE TO TULLEY MACHINE FALLING IN HOLE, UNSAFE CONDITION TO WORK______ 1 HOUR DELAY DUE TO DISCUSSION WITH BOVIS& DDC ON AREAS IN WHICH MACHINE CAN WORK MAN TARPING AND TRIMMING STATIONS____________________________________ _ MAN WATER STATIONS FOR DUST CONTROL____________________________________________ __ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ______________________________ CONTINUE REMOVING DEBRIS TOWER 2 '_________________________________ _ LOADS OUT 124 (8 L APPS ON TULLEY TRUCKING)

GRACE Cl:qn(I'^actin.g copp ) App O'.ed By: TitTr! ~bA j For: SUPERINTENDENT

01,314630

CITY_21MC100_003874701

NYC-WTC_000281690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000281690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280698

Daily workforce report for World Trade site with equipment and description details.

Similar indexed content

Compare copies and versions →