NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Jan 2002

Machine-extracted title · confidence 36%

Day preliminary daily workforce and equipment, World Trade, Jan 11, 2002.

NYC-WTC_000280819
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTFLACTING CORP. 1=1 45 6ih RoaJ. Whileslone. N.y 11357- (71«| 767-9000 DAT^-11-02 DAY FJ

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATIONQUANT. Description MANNED STANDBY IDLE ISUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN__________ 2 CAT 365 GRAPPLER 1 ISAFETY OFFICER 1 CAT 375 BUCKET 1 (laborers 22 CAT 375 GRAPPLER 1 [iron WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; TRISORO HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS a LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2.5 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILERyGENER.~ CARGO BOXES ~ 4 1 I DELAYS: 2 HOUR DELAY. RECOVERY OF FIREMEN FLAT TRUCK ~ 1 LOADING PROCESS SLOWED DOWN [PUMP 2 RAINMAKER/GENIE LIFT 1

Description of Work: COMPLETED WORK__________________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA __________________________________________ MAN WATERING STATIONS FOR DUST CONTROL EXPOSING THE PATH TRAINS 2 MACHINES LEVEL B-6. EL 242. 3 MACHINES AT LEVEL B-5, EL253 LOADS OUT. 86 EUKES OUT: 226

GRACE CONTRAP7IN6-CORP| Approved By: Title: For SUPERINTENDENT

DAILY WORK FORCE REPORT0111D.xls

CITY_21MC100_003918687

NYC-WTC_000280819

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280819Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →