NYC-WTC_000360917
Night preliminary daily workforce and equipment at World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗Day preliminary daily workforce and equipment, World Trade, Jan 11, 2002.
NYC-WTC_000280819OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTFLACTING CORP. 1=1 45 6ih RoaJ. Whileslone. N.y 11357- (71«| 767-9000 DAT^-11-02 DAY FJ
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATIONQUANT. Description MANNED STANDBY IDLE ISUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN__________ 2 CAT 365 GRAPPLER 1 ISAFETY OFFICER 1 CAT 375 BUCKET 1 (laborers 22 CAT 375 GRAPPLER 1 [iron WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; TRISORO HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS a LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2.5 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILERyGENER.~ CARGO BOXES ~ 4 1 I DELAYS: 2 HOUR DELAY. RECOVERY OF FIREMEN FLAT TRUCK ~ 1 LOADING PROCESS SLOWED DOWN [PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work: COMPLETED WORK__________________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA __________________________________________ MAN WATERING STATIONS FOR DUST CONTROL EXPOSING THE PATH TRAINS 2 MACHINES LEVEL B-6. EL 242. 3 MACHINES AT LEVEL B-5, EL253 LOADS OUT. 86 EUKES OUT: 226
GRACE CONTRAP7IN6-CORP| Approved By: Title: For SUPERINTENDENT
DAILY WORK FORCE REPORT0111D.xls
CITY_21MC100_003918687
NYC-WTC_000280819
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000360917
Night preliminary daily workforce and equipment at World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280778
Daily workforce and equipment at World Trade Center, Dec 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419124
Daily workforce report with classifications and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269236
Day preliminary daily workforce and equipment at World Trade site, Jan 11, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279979
Daily workforce and equipment list for World Trade Center site, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269237
Day or night shift daily workforce and equipment at World Trade site, Jan 2, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386661
Final night shift daily workforce sheet for World Trade Center project, December 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278603
Day final daily workforce and equipment at World Trade site, Dec 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305249
Preliminary daily workforce report for World Trade Center with crews and machinery.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429677
Day shift daily workforce and equipment allocations for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302452
Night preliminary daily workforce and equipment at World Trade Center site, Dec 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000360917
Night preliminary daily workforce and equipment at World Trade site, Jan 23, 2002.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280778
Daily workforce and equipment at World Trade Center, Dec 16, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419124
Daily workforce report with classifications and equipment at World Trade Center site.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269236
Day preliminary daily workforce and equipment at World Trade site, Jan 11, 2002.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279979
Daily workforce and equipment list for World Trade Center site, February 2002.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269237
Day or night shift daily workforce and equipment at World Trade site, Jan 2, 2002.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000360917
Night preliminary daily workforce and equipment at World Trade site, Jan 23, 2002.
Similar indexed content
NYC-WTC_000280778
Daily workforce and equipment at World Trade Center, Dec 16, 2001.
Similar indexed content
NYC-WTC_000419124
Daily workforce report with classifications and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000269236
Day preliminary daily workforce and equipment at World Trade site, Jan 11, 2002.
Similar indexed content
NYC-WTC_000279979
Daily workforce and equipment list for World Trade Center site, February 2002.
Similar indexed content