NYC-WTC_000280811OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP, , 51-tS 6th Road, wthitastona. N.Y, 11257- (718) 767JOOO DATE: 1-7-02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name S Location: World Trade Center Contract No. STANDBYl IDj Weather Condillons
Labor Equipment CLASSIFICATION QUANT. Description MANNED IISUPERINTENDENT 1 CAT 966 LOADER I PROJECT ENGINEER CAT 446 BACKHOE 1 HoFFlCE ENGINEER ~ CAT 973 LOADER 1 BFOREMEN 1 CAT 365 GRAPPLER 1 nSAFETY OFFICER ~ 1 CAT 375 BUCKET 1 ^LABORERS 21 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14_________ 6 HITACHI 550 BUCKET 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 3 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ' ROLL OFF ‘ DUMP TRAILERS ' LOW BED TRAILER DELIVERIES:_____________________________________ ' HIGH DECK TRAILERS ■
GREAT BEAR - 8 FIVE GALLON BOTTLES OF WATER ■ WELDING TRUCK 1 AWISCO - 24 REFLECTIVE SAFETY VESTS ■ FUEL TRUCK 1 ' PICKUP TRUCKS 5 ■ LIGHT TOWERS 13 ■ SITE MULE 3 DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ' OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ' FLAT TRUCK ■ PUMP 2 ' RAINMAKER/GENIE LIFT 1
Description of Work:___________________________________________________________________________________ completed work CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL LOADS OUT: 142 __________________________________________________________________________________ EUKESOUT; 226
GRACE CONTRACTING CORP| Approved By: |BY: Tide: For: SUPER»NTeNDeNT
DAILY WORK FORCE REPORT0107D.XLT
CITY_21MC1OO_OO3918679
NYC-WTC_00028081 1
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419178
Night final daily workforce and equipment for 2/5/02 World Trade.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432513
Daily workforce and equipment listing for World Trade Center site, Dec 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389494
Night final daily workforce report for World Trade, Dec 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302472
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278612
Day final daily workforce and equipment at World Trade site, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
1 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419178
Night final daily workforce and equipment for 2/5/02 World Trade.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432513
Daily workforce and equipment listing for World Trade Center site, Dec 15, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
Similar indexed content
NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
Similar indexed content
NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similar indexed content
NYC-WTC_000419178
Night final daily workforce and equipment for 2/5/02 World Trade.
Similar indexed content