GRACE CONT (ACTING CORP. 15l.4SSIhRoad. Whitesi ma, N.Y, 11357.(718)787.9000 DATE: 1/3/01 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Locatl in: World Trade Center Contract No. Weather Condition COOL & OVERCAST
Labor_________ IIf Equipment isUPERINTENDENT CLASSIFICATION QUANT, iIf Description MANNED STANDBY IDLEI 3 iiCAT 966 LOADER 1 PROJECT ENGINEER i If|CAT CAT 446 BACKHOE 973 LOADER ~ 1 OFFICE engineer! 1 FOREMEN SAFETY OFFICER I I 2 CAT 375 BUCKET CAT 375 GRAPPLER 1 1 ILABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 BUCKET 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER I 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS I 1 MECHANICS TRUCK 1 1 MECHANICS i 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN ROLL OFF BdUMP TRAILERS Blow bed trailer ~ WORKED IN THE AREA OF THE CHILLER ROOM AND HIGH DECK TRAILERS ~ VISTA LOADED EUKES [welding truck ~ TULLY HAD 6 EUKES IN HOLE' FUELTRUCK 1 973 LOADED EUKES PICKUP TRUCKS 3 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 2. CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1
Description of Work: ^COMPLETED WORK CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO AND SOUTH OF MAIN CHILLER"pLANT MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA ~ MANNED WATERING STATIONS FOR DUST CONTROL ' “
GRACg'y NTRACTING CORP Approved By: Title: For: ISUPyiNliNDENT \
DAILY WORK FORCE REPORT0103N.xls
CITY_21MC1OO_OO3918674
NYC-WTC_000280806
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302524
Night preliminary daily workforce and equipment for World Trade, Jan 9–12, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419267
Daily manpower and equipment roster for World Trade Center site, Jan 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302457
Daily workforce report listing crews and equipment for World Trade site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280135
Night shift daily workforce and equipment at World Trade Center site, Jan 3, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305441
Day final daily labor and equipment roster for World Trade Center site, January 7, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000244009
Night final daily workforce and equipment at World Trade site, Feb 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388371
Day shift daily workforce and equipment at World Trade site, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388157
Daily workforce and equipment deployment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279852
Daily workforce and equipment listing for World Trade Center site, February 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388407
Thursday night final daily workforce report for World Trade site; includes equipment.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278980
Final daily workforce report for World Trade Center site, December 14, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280778
Daily workforce and equipment at World Trade Center, Dec 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000302524
Night preliminary daily workforce and equipment for World Trade, Jan 9–12, 2002.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419267
Daily manpower and equipment roster for World Trade Center site, Jan 3, 2001.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302457
Daily workforce report listing crews and equipment for World Trade site, Dec 2001.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280135
Night shift daily workforce and equipment at World Trade Center site, Jan 3, 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305441
Day final daily labor and equipment roster for World Trade Center site, January 7, 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000244009
Night final daily workforce and equipment at World Trade site, Feb 27, 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000302524
Night preliminary daily workforce and equipment for World Trade, Jan 9–12, 2002.
Similar indexed content
NYC-WTC_000419267
Daily manpower and equipment roster for World Trade Center site, Jan 3, 2001.
Similar indexed content
NYC-WTC_000302457
Daily workforce report listing crews and equipment for World Trade site, Dec 2001.
Similar indexed content
NYC-WTC_000280135
Night shift daily workforce and equipment at World Trade Center site, Jan 3, 2002.
Similar indexed content
NYC-WTC_000305441
Day final daily labor and equipment roster for World Trade Center site, January 7, 2002.
Similar indexed content