machine-extracted · confidence unavailable · Check page ↗Night final daily workforce report for World Trade site, Dec 27 2001.
NYC-WTC_000280798OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
li GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone. N.Y. 113S7-(718)767-9000 DATE: THURSDAY 12/27/01 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions Windy & Cold
Labor fI Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE! SUPERINTENDENT 3 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 375 GRAPPLER 1 SAFETY.OFFICER CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS jHITACHI 550 GRAPPLER ~ 1 BLOCAL 14 5 IhITACHI 550 GRAPPLER~ 1 LOCAL 15 B HITACHI 1200 GRAPPLER' 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 ^MECHANICS 1 TOOL TRUCK BHOUSE WRECKERS 7 TOOL VAN CAT 365 GRAPPLER 1 DUMP TRAILERS LOW BED TRAILER All machines worked in bottom of piL 1200/375 -1 were HIGH DECK TRAILERS working around Vista digging into B6 level. 1200 during WELDING TRUCK the course of the night broke a hard line to the stick - this FUEL TRUCK 1 wasjepaitedan_the_1200_wen£back_toworkwork^until4^30 PICKUP TRUCKS 2 developed overheating problems. 375 early in the /KM worked LIGHT TOWERS 13 with Gateway & pulled a chiller from the chiller room. 375 SITE MULE 3 worked south of Vista - loading eiikes. 750 was working | DUMP TRUCKS north of the north wall tower 2 until it broke a hydraulic line 10 WHEEL DUMP TRUCK and was replaced with 375 - 2 FLASHING ARROW BOARD 1 973 worked in bottom of pit loading eukes. ________ OFFICE TRAILER/GENER. 1 Trucking summary on separate sheet CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1
Description of Work:
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA
GRACE CONTRACTING CORP Approved By: Title; BY: For; SUPERINTENDENT
■ ■ DAILY WORK FORCE REPORT1227N.xls
CITY_21MC100_003918661
NYC-WTC_000280798
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280127
Night shift daily workforce and equipment for World Trade site, Dec 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305344
Night final daily workforce log for World Trade Center site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386407
Daily workforce and equipment listing for World Trade Center project; final night shift.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279957
Night shift daily workforce report for World Trade site; equipment and crew listed.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388407
Thursday night final daily workforce report for World Trade site; includes equipment.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268598
Day shift final daily workforce and equipment assignments for WTC site.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322147
Night final daily workforce and equipment roster for World Trade Center site, December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305534
Night final daily workforce report for World Trade site.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280127
Night shift daily workforce and equipment for World Trade site, Dec 27, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305344
Night final daily workforce log for World Trade Center site, Dec 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386407
Daily workforce and equipment listing for World Trade Center project; final night shift.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
Similar indexed content
NYC-WTC_000280127
Night shift daily workforce and equipment for World Trade site, Dec 27, 2001.
Similar indexed content
NYC-WTC_000305344
Night final daily workforce log for World Trade Center site, Dec 2001.
Similar indexed content
NYC-WTC_000386407
Daily workforce and equipment listing for World Trade Center project; final night shift.
Similar indexed content
NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content