NYC-WTC_000389504
Night final daily workforce at World Trade site, Dec 21, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Night daily workforce record for World Trade site, Dec 21 2001.
NYC-WTC_000280789OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.^5 6th Road. WhSostone. N.Y. 11367 (718) 767 0000 DATE; DECEMBER 21. 2001 (NIGHT ) FINAL DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions PARTLY CLOUDY AND SEASONABLY COOL
Labor Equipment CLASSIFICATION QUANT. Description iMANNED S1AND0Y IDLE SUPERINTENDENT 2- CAT 966 LOADER . 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER • 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 16 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER T LOCAL 14 5 HITACHI 550 BACKHOE 1 LOCAL 15 8 HITACHI 550 GRAPPLER 1 [CARPENTER HITACHI 1200 GRAPPLER 1 iCARPENTER FOREMAN 185 CFM COMPRESSOR 1 TEAMSTERS 1 235 HAMMER HOE RAM 1 MECHANICS 1 MECHANICS TRUCK 1 1 HOUSE WRECKERS 4 TOOL TRUCK TOOL VAN . ROLL OFF !DUMP TRAILERS DELIVERIES: CAT 345, GRAPPLE LOW BED TRAILER 2 - 375 ON JOB WORKING TONITE. ONE 375 WAS LOADING HIGH DECK TRAILERS OUT VISTA INTO EUKES/ FLATS I WELDING TRUCK SECOND 375 WAS LOADING EUKES WITH MATERIAL BEING FUEL TRUCK 1 PASSED TO IT BY THE 1200 PICKUP TRUCKS 2 1200 WAS EATING INTO THE VISTA - SE CORNER. LIGHT TOWERS 11 750 WORKING IN VICINITY OF CHILLER ROOM PASSING SITE MULE 3 DEBRIS TO GATEWAY - LOADING EUKES. DUMP TRUCKS 10 WHEEL DUMP TRUCK NYL 71 FLATBED WAS DAMAGED BY MAZZOCHI PUTTING FLASHING ARROW BOARD 1 |TOO LARGE A PIECE OF STEEL ON FLAT. OFFICE TRAILER/GENER. 1 CARGO BOXES 4 ICONFUSION AS TO WHERE TO DUMP TRAILERS (HAMILTON~ [FLAT TRUCK 1 lOR PIER 25) CAUSED A TRUCKING DELAY 3 TRUCKS 4 HRS [PUMP 2 I2 TRUCKS 3 HOURS - SEE ATTACHED MEMO | [roller T [TRUCKING ON SEPARATE SHEET. ~| RAINMAKER/GENIE LIFT 1 * -------- Description ol Work;
MAN TARPING AND TRIMMING STATIONS MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LEVELS B-5, EL 253
GRACE CONTRACTING CORP Approved By; iTille:_______ For: SUPERINTENDENT 7Z.
DAILY WORK FORCE REPORT 1221N.xls
CITY_21MC100_0 02961716
NYC-WTC_000280789
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389504
Night final daily workforce at World Trade site, Dec 21, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268598
Day shift final daily workforce and equipment assignments for WTC site.
3 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302517
Night shift daily workforce and equipment at World Trade, Dec 21, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279957
Night shift daily workforce report for World Trade site; equipment and crew listed.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419117
Night shift workforce and equipment for World Trade Center, Dec 21, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280117
Night shift daily workforce and equipment for World Trade site, Dec 21, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322147
Night final daily workforce and equipment roster for World Trade Center site, December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278675
Daily workforce and equipment details for World Trade Center site, December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432483
Night final daily workforce and equipment report for World Trade Center, Nov 30, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267307
Daily labor and equipment roster for World Trade Center work location.
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305390
Nightly workforce and equipment totals for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000389504
Night final daily workforce at World Trade site, Dec 21, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268598
Day shift final daily workforce and equipment assignments for WTC site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302517
Night shift daily workforce and equipment at World Trade, Dec 21, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279957
Night shift daily workforce report for World Trade site; equipment and crew listed.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419117
Night shift workforce and equipment for World Trade Center, Dec 21, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389504
Night final daily workforce at World Trade site, Dec 21, 2001.
Similar indexed content
NYC-WTC_000268598
Day shift final daily workforce and equipment assignments for WTC site.
Similar indexed content
NYC-WTC_000302517
Night shift daily workforce and equipment at World Trade, Dec 21, 2001.
Similar indexed content
NYC-WTC_000279957
Night shift daily workforce report for World Trade site; equipment and crew listed.
Similar indexed content
NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similar indexed content