Daily work force report, World Trade Center, Dec 18 2001

Machine-extracted title · confidence 45%

Day shift daily workforce and equipment at World Trade Center, Dec 18, 2001.

NYC-WTC_000280782
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 601 Road. VWillOdtnna. N.Y. 11357-(716! 767-5000 DATE: DECEMBER 18,2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor ir Equipment CLASSIFICATION QUANT. (T Description MANNED I STANDBY IDLE ^SUPERINTENDENT 1 HCAT 966 LOADER________ 1 [(project engineer ~ 2 [ CAT 446 BACKHOE ~ 1 1 CAT 973 LOADER OFFICE ENGINEER 1 1 1 CAT 365 GRAPPLER 1 FOREMEN____________ SAFETY OFFICER 1 J CAT 375 GRAPPLER 1 LABORERS___________ 23 [ HITACHI 750 GRAPPLER~ t IRON WORKERS I ^HITACHI 550~GRAPPLER~ 1 LOCAL 14 6 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER__________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 ' mechanics'truck ~ 2 MECHANICS__________ 2 IItool truck ~ HOUSE WRECKERS 7 ■ TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS ^fcc^^lES: AWISCO ■ LOW BED TRAILER IhIGH DECK TRAILERS I AUSTER RUBBER BwELDING TRUCK ~ 1 i BLACK BEAR 1FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS J PICKUP TRUCKS 8 Flight towers ~ 13 ](sitemule 3 DUMP TRUCKS •NOTE’ 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 IGHT TOWERS USED FOR 3 HOURS ■ RAINMAKER/GENIE LIFT 1

Description of Work:_________________________________________________________________________ ONLAYS: 12:30- 2:15 OLfT OF HOLE FOR PULLING OF BUILDING ite_______________________________ DELAYS; HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 S, 2__________________ MANNED TARPING AND TRIMMING STATIONS _________________________________________ _ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________ _ ______________________________ MANNED WATERING STATIONS FOR DUST CONTROL_________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 ANO EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY

GRACH CONTRACTING CORP ^toproved By: BY: I J SUPERlNTerftliTSa

DAILY WORK FORCE REPORT 1218D.xls

CITY_21MC100_003918644

NYC-WTC_000280782

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280782Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280698

Daily workforce report for World Trade site with equipment and description details.

Similar indexed content

Compare copies and versions →