NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 601 Road. VWillOdtnna. N.Y. 11357-(716! 767-5000 DATE: DECEMBER 18,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor ir Equipment CLASSIFICATION QUANT. (T Description MANNED I STANDBY IDLE ^SUPERINTENDENT 1 HCAT 966 LOADER________ 1 [(project engineer ~ 2 [ CAT 446 BACKHOE ~ 1 1 CAT 973 LOADER OFFICE ENGINEER 1 1 1 CAT 365 GRAPPLER 1 FOREMEN____________ SAFETY OFFICER 1 J CAT 375 GRAPPLER 1 LABORERS___________ 23 [ HITACHI 750 GRAPPLER~ t IRON WORKERS I ^HITACHI 550~GRAPPLER~ 1 LOCAL 14 6 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER__________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 ' mechanics'truck ~ 2 MECHANICS__________ 2 IItool truck ~ HOUSE WRECKERS 7 ■ TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS ^fcc^^lES: AWISCO ■ LOW BED TRAILER IhIGH DECK TRAILERS I AUSTER RUBBER BwELDING TRUCK ~ 1 i BLACK BEAR 1FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS J PICKUP TRUCKS 8 Flight towers ~ 13 ](sitemule 3 DUMP TRUCKS •NOTE’ 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 IGHT TOWERS USED FOR 3 HOURS ■ RAINMAKER/GENIE LIFT 1
Description of Work:_________________________________________________________________________ ONLAYS: 12:30- 2:15 OLfT OF HOLE FOR PULLING OF BUILDING ite_______________________________ DELAYS; HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 S, 2__________________ MANNED TARPING AND TRIMMING STATIONS _________________________________________ _ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________ _ ______________________________ MANNED WATERING STATIONS FOR DUST CONTROL_________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 ANO EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY
GRACH CONTRACTING CORP ^toproved By: BY: I J SUPERlNTerftliTSa
DAILY WORK FORCE REPORT 1218D.xls
CITY_21MC100_003918644
NYC-WTC_000280782
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280829
Day shift daily workforce and equipment at World Trade, Jan 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280698
Daily workforce report for World Trade site with equipment and description details.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432506
Final daily workforce report for World Trade Center site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281690
Daily workforce report listing personnel and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269236
Day preliminary daily workforce and equipment at World Trade site, Jan 11, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280761
Night shift workforce and machinery at World Trade Center, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302469
Day final daily workforce and equipment for World Trade site, Dec 20, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386633
November 13, 2001 FINAL daily workforce and equipment summary for World Trade.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280829
Day shift daily workforce and equipment at World Trade, Jan 12, 2002.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280698
Daily workforce report for World Trade site with equipment and description details.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432506
Final daily workforce report for World Trade Center site, Dec 12, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281690
Daily workforce report listing personnel and equipment for World Trade Center project.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
Similar indexed content
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000280829
Day shift daily workforce and equipment at World Trade, Jan 12, 2002.
Similar indexed content
Daily workforce report for World Trade site with equipment and description details.
Similar indexed content
NYC-WTC_000432506
Final daily workforce report for World Trade Center site, Dec 12, 2001.
Similar indexed content