Daily work force report, World Trade Center, Dec 16 2001

Machine-extracted title · confidence 45%

Night shift daily workforce and equipment at World Trade Center, Dec 16, 2001.

NYC-WTC_000280779
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 6lh Road. Whileslone. N.Y. 11357-(718! 767-9000 DATE: SUNDAY 12/16/01 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor J|I___________ Equipment CLASSIFICATION ■quant. I Description MANNED STANDBY IDLE SUPERINTENDENT i CAT 966 LOADER 1 PROJECT ENGINEER i CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER ~ 1 IjHITACHI 550 GRAPPLE^ 1 IRON WORKERS LiTACHI 550 GRAPPLE^ 1 LOCAL 14 8 BhITACHI 1200 GRAPPLER" 1 LOCAL 15 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 iIteamsters ~ I MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 10 TOOL VAN ' ROLL OFF ■ DUMP TRAILERS ■ LOW BED TRAILER DELIVERIES; — HIGH DECK TRAILERS ' WELDING TRUCK FUEL TRUCK 1 ■ PICKUP TRUCKS 1 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ' CARGO BOXES 3 ■ FLAT TRUCK ' PUMP 2 ' ROLLER ' RAINMAKER/GENIE LIFT 1

Description ot Work:_____________________________________________________ _______________________ COMPLETED WORK MAN TARPING AND TRIMMING STATIONS_________________________________________________ ■ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR OUST CONTROL_______________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT: EUCLIDS VIA TULLY - 41; EUCLIDS VIA MA2ZOCH1 - 10 FLATBEDS/DUMPTRAILERS VIA TULLY - 18________________________________________ FLATBEOS/DUMPTRAILERS VIA BOVIS -16 DELAYS - STOPPAGES TOTALING 2 HOURS AS A RESULT OF BLDG. 6 SAFE AREA GRACE CONTRACTINtj'cORP Approved By: Title: BY: For; SUPERINTENOENT /

DAILY WORK FORCE REPORT1216N.xls

CITY_2 IMCl 0 0_Ci 00698778 NYC-WTC_000280779

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280779Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →