Daily work force report, World Trade Center, Dec 13 2001

Machine-extracted title · confidence 45%

Day shift daily workforce and equipment at World Trade Center, Dec 13, 2001.

NYC-WTC_000280773
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISHSCinRoad. WhilBSlono, H Y 11357- (716) 76/-9000 DATE; DECEMBER 13. 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor L_________ Equipment CLASSI FICATIW QUANT. I Description MANNED STANDBY lOLEl 1 ' jcAT 966 LOADER 1 SUPERINTENDENT PROJECT ENGINEER 1 GAT 446 BACKHOE 1 OFFICE ENGINEER ' CAT 973 LOADER ~ 1 FOREMEN 1 ' CAT 365 GRAPPLER 1 [IcAT 375 GRAPPLER 1 ■ SAFETY OFFICER LABORERS 26 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 10 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 1235 HAMMER HOE RAM " 1 TEAMSTERS 1 [ MECHANICS TRUCK " 2 MECHANICS 2 [TOOL TRUCK ~~ 8 1TOOL VAN 1 HOUSE WRECKERS IpOLLOFF DUMP TRAILERS " LOW BED TRAILER 7 DELIVERIES. TRIBORO HARDWARE HIGH DECK TRAILERS ~~~ AUSTER RUBBER IWELDING TRUCK 1 >UEL TRUCK ~ 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK flashing ARROW BOARD 1 OFFICE TRAILER/GENER. 1 I CARGO BOXES ~ 3 [ FLAT TRUCK ~ 1 [PUMP ~ 2 LIGHT TOURS USED FOR 3 HOURS BRQLLER 1 1RAINMAKER/GEN1E LIFT 1

Description of Work: LOADS OUT: 40 YOKES OUT: 65 DELAYS GATEWAY 600 GRACE 550 OUE TO SEARCH AND RECOVERY MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL___________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________ __ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 INSTALLATION OF GPS SYSTEMS__________________________________ PUT UP CRANE MATS________________ ELEVATIONS. ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP^—x Approved By: Title; ByH For; SUPERINTENDENT

DAILY WORK FORCE REPORT 1213D.xls

CITY_21MC100_003918638

NYC-WTC_000280773

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280773Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →