Daily work force report, World Trade Center, Dec 11 2001

Machine-extracted title · confidence 45%

Daily workforce and equipment at World Trade Center, Dec 11, 2001.

NYC-WTC_000280769
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151JS 6U1 Road. Whitestone. N.Y. 11357- (718) 767-9000 DATE; DECEMBER 11, 2001 (DAY ) FINAL DAILY WORK FORCE REPORT )

Job Name & Location: World Trade Centar {contract No. leather Conditions

Labor ifI Equipment CLASSIFICATION QUANT. [[I Descfiplion MANNED STANDBY IDLE) SUPERINTENDENT 2 ftCAT 966 LOADER 1 PROJECT ENGINEER 2 If [cat 446 BACKHOE ~ 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRONWORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1. CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 MTEAMSTERS 1 MECHANICS TRUCK 2 ^MECHANICS ' 2 TOOL TRUCK 1 IjHOUSE WRECKERS 8 TOOLVAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; TRIBORO.HARDWARE HIGH DECK TRAILERS AWISCO WELDING TRUCK ~ 1 IFUELTRUCK ~~ 1 BPICKUP TRUCKS ~ 9 [[LIGHT TOWERS 13 I SITE MULE 3 |dUMP TRUCKS [10 WHEEL DUMP TRUCK~ DELAYS; ENTIRE JOB SHUT DOWN FOR 1 HOUR [FLASHING ARROW BOAR'D 1 DUE TO MEMORIAL SERVICE loFFICE TRAILER/GENER7~ 1 [CARGO BOXES " 3 iFLAT TRUCK " 1 Ipump 2 [ROLLER ~ 1 Irainmaker/genie lift 1

Descfiplion of Work; ______________________ DELAYS 1200 DOWN 11 AM ALL DAY TO SEARCH FOR PORT AUTHORITy POLICE OFFICER LOAD OUT STEEL AND DEBRIS________________________________________ MANNED TARPING AND TRIMMING STATIONS ~ ~ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ............ ELEVATIONS; ALL MACHINES LEVEL B-5 253 LOADS OUT 50 YOKE LOADS 48 GRACE CONTRACTiXytO^ Approved By; -BY;t Title; For SUPERINTENDENT

DAILY WORK FORCE REPORT 1211D.xls

CITY_21MC100_000698774 NYC-WTC_000280769

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280769Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →