Daily work force report, World Trade Center

Machine-extracted title · confidence 28%

Final daytime staffing and machinery at World Trade Center, Dec 5, 2001.

NYC-WTC_000280758
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. l5t.4S6'J>Road, M.Y. 5»J5T-(7)6) 167-9006 DATE: DECEMBER 5. 2001 (DAY ) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trada Canter Contract No. Weather Conditions

Labor j Equipment 1 CLASSIFICATION QUANT. Description MANNED STANDBY Isuperintenoent 1 CAT 966 LOADER 1 jPROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 BCAT 365 GRAPPLER ~ 1 [safety OFFICER 1 CAT375GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 [IRON WORKERS 1 HITACHI 550 GRAPPLER 1 {local ta 4 HITACHI 550 GRAPPLER 7 {local 15 ~ 8 ■ HITACHI 1200 GRAPPLER t CARPENTER 1 ■ 165 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ' 235 HAMMER HOE RAM [TEAMSTERS 11 ■ MECHANICS TRUCK 2 {mechanics 2 ■ TOOL TRUCK 1 HOUSE WRECKERS 7 POOL VAN ~ 1 {ROLL OFF j DUMP TRAILERS 7 [{low BED TRAILER iPELIVERIES: AWISCO [{high DECK TRAILERS ~ 3 r ABCO IwELDING TRUCK . 1 1 FUELTRUCK 1 [{pickup trucks 8 iLIGHT TOWERS ~ 13 ‘ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ' OFFICE TRAILEfVGENER. 1 ' CARGO BOXES 3 IGHT TOWERS USED FOR 2.5 HOURS ' FLAT TRUCK 1 " PUMP 2 ■ ROLLER_________________ 1 ' RAINMAKER/GENIE UFT 1

Description o( Work: DELAYS: 2:30-4:00 PM ALL WORK STOPPED LOAD OUT STEEL ANO DEBRIS " -- -------- MANNED TARPING AND TRIMMING STATIONS - -- - ----------- ------------ MANNED WATER STATIONS FOR OUST CONTROL MAINTAIN TRAFFIC FLOW IN ANO OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC’S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 LOADS OUT 53 YUKE LOADS 35 GRACE CONTRACTING CORP [ " 7 Approved By: f TiDe: BY: • For SUPeRINTENDEMT

DAILY WORK FORCE REPORT 1205D.xls

CITY_21MC100_003918623

NYC-WTC_000280758

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280758Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →