NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Nov 2001

Machine-extracted title · confidence 42%

Daily workforce and equipment listing for World Trade Center construction site, November 2001.

NYC-WTC_000280747
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

, GRACE CONTRACTING CORP. 6tn Road. ■MllUatollB. N.Y. 1:337-(716)767-9000 DATE; MONDAY. NOVEMBER 26. 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

JcL Nans & Location: World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILD - DARK

Labor X___________ Equipment CLASSIFICATION UANTIT ]l Description MANNED STANDBY IDLE [SUPERINTENDENT 2 ■ CAT 966 LOADER PROJECT ENGINEER 1 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 373 LOADER 1 — FOREMEN 1 ■ CAT365GRAPPLER 1 SAFETY OFFICER 1 jlCAT 375 GRAPPLER 1 LABORERS 20 ’iIhITACHI TSO GRAPPLER ~ 1 IRON WORKERS 1 IHITACHI 550 GRAPPLER ~ 1 LOCAL 14 4 I HITACHI 5SO~GRAPPLER ~ 1 LOCAL 15 9 IjHlTACHI 1200 GRAPPLE^ 1 CARPENTER 'll 85 CFM COMPRESSOR ~ 1 CARPENTER FOREMAN 2 ' MECHANICS TRUCK 2 TEAMSTERS 11 ‘ TOOL TRUCK 1

I [MECHANICS__________ HOUSE WRECKERS 2 " TOOL VAN 4 ' ROLL OFF ■ DUMP TRAILERS 1

8 ■ LOW BED TRAILER ' HIGH DECK TRAILERS 2 ■ WELDING TRUCK_________ 1 FUELTRUCK 1 PICKUP TRUCKS 5 ' LIGHT TOWERS 8 ■ PARTS TRUCK 1 ■ DUMP TRUCKS 10 WHEEL DUMP TRUCK ' FLASHING ARROW BOARD 1 " OFFICE TRAILER 1 “ CARGO BOXES 3 ■ FLAT TRUCK 1 ’ PUMP 2 ■ 85'FOOT GENIE 1 " ANGEL AERIALfDUST SUPR 1 " GENERATOR 60KW 1

Description of Work: ~ LOADS OUT: 140 S^WTINGALONG^STSLy^Y^^LSO^^FWR^^ESSROAD^ZZZZZZZZZZZZZZZ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL ' . .............. ' .... .......... IViAiNTAiN traffic”FLOW IN AND OUT OF AREA ~ ~~~ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 ' DELAYS; 1 HR (12.00-1:00)’ WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA 3 HOURS WITH GATEWAY 550 4 GRACE 750 AT NZE CORNER OF TOWER 2 CORE WHILE s'eARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED ' ----- ------------------------------

GRACE CONTRACTING CORP Approved By. Title.- BIC__________ For; SUPERINTENDENT

CITY_21MC1OO_OO39186O8

NYC-WTC_000280747

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280747Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →