Daily work force report, World Trade Center, Nov 13, 2001

Machine-extracted title · confidence 25%

Finalized daily workforce and equipment report for World Trade Center, Nov 13, 2001.

NYC-WTC_000280727
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6lh Road. Whilesic-a. N Y 11357.(718) 767.9000 DATE: NOVEMBER 13. 2001 ) FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor I[____________ Equipment CLASSIFICATION QUANTIT |[I Description MANNED STANDBY IDLE SUPERINTENDENT 2 [[cat 966 LOADER 1 ♦ ^T 446 BACKHOE ~ PROJECT ENGINEER i it[cat 973 LOADER 1 OFFICE ENGINEER 1 FOREMEN CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER t LABORERS 26 HITACHI 750 GRAPPLER I IRON WORKERS 1 [HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185CFM COMPRESSOR 1 CARPENTER FOREMAN 3 MECHANICS TRUCK 2 TEAMSTERS 13 TOOL TRUCK 2 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 3 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK 1 3 TICKETS AWISCO FUEL TRUCK 2LOADS millings; 4 PICKUP TRUCKS 5 light TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS ilO WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK PUMP 2

Description of Work:___________________________________________________________________________ 2 HOUR DELAY DUE TO TULLEY MACHINE FALLING IN HOLE, UNSAFE CONDITION TO WORK_______ 1 HOUR DELAY DUE TO DISCUSSION WITH BOVIS& DDC ON AREAS IN WHICH MACHINE CAN WORK MAN TARPING ANO TRIMMING STATIONS MAN WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC ; LOW IN AND OUT OF AREA________________________________________________ CONTINUE REMOVING DEBRIS TOWER 2 '_____________________________________________________ LOADS OUT 124 (8 L aODS ON TULLEY TRUCKING)

GRACE CONTACTING COpP \

Apf 3'. ed By: Tiilt^ For. superintendent >

CITy_21MC100_003918583

NYC-WTC_000280727

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280727Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280698

Daily workforce report for World Trade site with equipment and description details.

Similar indexed content

Compare copies and versions →