NYC-WTC_000388207
Night shift daily workforce listing for World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment at World Trade, November 2001.
NYC-WTC_000280055OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6m Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; NOVEMBER 11,2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER ICAT 973 LOADER 1 FOREMEN 1 ' CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER 1 LABORERS 24 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ' HITACHI 550 GRAPPLER 1 LOCAL 14 6 [ HITACHI 550 GRAPPLER 1 LOCAL 15 8 [ HITACHI 1200 grapple'^ 1 CARPENTER 1 1185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 [ MECHANICS TRUCK 2 TEAMSTERS 13 [It OOL TRUCK 2 MECHANICS 2 [TOOL VAN 1 HOUSE WRECKERS 4 1 ROLL OFF jpUMP TRAILERS 9 [ LOW BED TRAILER IHIGH DECK TRAILERS 3 [WELDING TRUCK 1FUEL TRUCK 1 IIpICKUP TRUCKS 4 IlIGHT TOWERS ~ 8 ■ PARTS TRUCK 1 ' DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK [FLASHING ARROW BOAfW 1 MOFFICE TRAILER 1 IrrUBE TRAILER 3 FLAT TRUCK 1 PUMP 2 ANGEL ARIEL(DUST SUPR) 1 85' GENIE LIFT 1
Description of Work:______________________________________________________________________ 9 TULLY LOADS FROM SLURRY WALL______________________________________________________ LOADS OUT: 59________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS__________________________________________________ MAN WATER STATIONS FOR DUST CONTROL_______________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________________________________ CONTINUE REMOVING DEBRIS TOWER 2___________________________________________________ DELAYS: 375 DELAYED 1 HOUR DUE TO UNSAFE WORK CONDITIONS CAUSED BY TULLY (0745-0845) _______ 1200 DOWN AT 5 PM - BROKEN GRAPPLE, STILL DOWN_______________________________ 1145 am - 3pm - EVERYTHING DOWN DUE TO PRESIDENTIAL VISIT
GRACE CONTRACTING CORP 'Approved By: TiUe; BY: For; SUPERINTENDENT
CITY_21MC100_004484335
NYC-WTC_000280055
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388207
Night shift daily workforce listing for World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429685
Day shift labor and equipment details for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388333
Daily workforce and equipment listing for World Trade Center site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388337
Daily workforce and equipment listing for World Trade Center site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305037
Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388207
Night shift daily workforce listing for World Trade site, Nov 11, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429685
Day shift labor and equipment details for World Trade Center project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388333
Daily workforce and equipment listing for World Trade Center site, Nov 11, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388207
Night shift daily workforce listing for World Trade site, Nov 11, 2001.
Similar indexed content
NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
Similar indexed content
NYC-WTC_000429685
Day shift labor and equipment details for World Trade Center project.
Similar indexed content
NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similar indexed content
NYC-WTC_000388333
Daily workforce and equipment listing for World Trade Center site, Nov 11, 2001.
Similar indexed content