Daily work force report, World Trade site, Oct 2001

Machine-extracted title · confidence 38%

Night shift daily workforce and equipment at World Trade site, Oct 2001.

NYC-WTC_000280031
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: OCTOBER 20, 2001 (NIGHT) FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor I Equipment CLASSIFICATION UANTIT I Description MANNED IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN j~F~ CAT365GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 2 LOCAL 14 4 HITACH11200 1 LOCAL 15 7 COMPACTION TRUCK 1 CARPENTER 1 MECHANICS TRUCK 1 CARPENTER FOREMAN TOOL TRUCK 1 TEAMSTERS 18 TOOL VAN MECHANICS 1 ROLL OFF 1 HOUSE WRECKERS 7 DUMP TRAILERS 7 LOW BED TRAILER 1 HIGH DECK TRAILERS 8 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 1 LIGHT TOWERS PARTS TRUCK 6 DUMP TRUCKS 1 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 AaCETELYNE (MED) 10 HACETELYNE (LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3

Description of Work:___________________________________________________________________________ TOTAL LOADS OUT: 67; LOADS OF DEBRIS: 23; LOADS OF STEEL: 44________________________________ REMOVED DEBRIS FROM SITE, MAINTAINED TRAFFIC FLOW,______________________________________ MANNED WATERING SITE FOR DUST CONTROL, MANNED TARPING STATION.________________________ HITACHI 1200 DELAYED 1/2 NIGHT BY FDNY ACTIVITY.____________________________________________ PIERS 6 & 25 SLOW UNLOADING; UNLOADED ALL TRAILERS AND WAITED FOR TRAILERS TO BE UNLOADED AT PIERS.________________________________________________________________________ COMMISSIONER BURTON ON SITE UPSET THAT NO TRUCKS WERE BEING LOADED. HE SENT US______ 2 TRUCKS FROM TULLY, 6 FROM TURNER, & NUMEROUS DOT AND SANITATION TRUCKS._____________ SANITATION TRUCKS AND DOT TRUCKS HAD PRIORITY LOADING, LEAVING OUR TRUCKS WAITING IDLE.

Approved By: Title: BY: For:

V 1!

CITY_21MC100_004484291

NYC-WTC_000280031

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280031Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →