GRACE CONTRACTING CORP. 151-45 6lh Road. Whileslone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 4, 2001 (NIGHT FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 18 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 10 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 NOTE: REMOVAL OF DEBRIS HAMPERED ENTIRE SHIFT BY PICKUP TRUCKS 2 ACTIVITIES AT CHILLER PLANT LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER 1 ■ RAINMAKER/GENIE LIFT 1
Description of Work:_____________________________________________________________________________________ LOADS OUT: 2________________________________________________________________________________________ LOAD OUT STEEL AND DEBRIS__________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS________________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL____________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE WEST WALL COLUMN BEAMS________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253 ____ __________________________________________
GRACE CONTRACTING CORP Approved By: Title: BY; For: SUPERINTENDENT^
DAILY WORK FORCE REPORT 1204N.xls
CITY_21MC100_001383329 NYC-WTC_000280005
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280001
Night shift labor and equipment at World Trade Center, Grace Contracting, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388368
Night shift daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322153
Day final daily workforce and equipment for World Trade Center site, January 12, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302414
Day final daily workforce and equipment at World Trade Center site, November 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280001
Night shift labor and equipment at World Trade Center, Grace Contracting, December 5, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
Similar indexed content
NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similar indexed content
Night shift labor and equipment at World Trade Center, Grace Contracting, December 5, 2001.
Similar indexed content
NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similar indexed content
NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
Similar indexed content