NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional work authorization, World Trade Center site

Machine-extracted title · confidence 28%

Work authorization document for demolitions at World Trade Center project with contractor contact data.

NYC-WTC_000279760
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

z A ITIONAL WORK AUTHORIZATION \

MAZZOCCHI WRECKING 32 WILLIAMS PARKWAY 04y< is-14 P. O BOX 331 EAST HANOVER, NJ 07936-0331 PHONE: (973) 884-8682 OAVsHirr FAX: (973) 377-7464 OWNER'S PHONE name Evergreen Recycling Of Corona (EROC) [718] 446-7 JOB NAME JOB NUMBER Willets Point Boulevard World Trade Center crn STATE STREET Corona New York EXISTING CONTRACT NUMBER DATE OF EXISTING CONTRACT CITY STATE New York City New York You are authorized to perform the following specifically described additional work: I Cat 246 Skid Steer IX A Ingersoll Rand Air Comprssor IX IHitachi 450 w/Grapple I L Miller Maintenance Trailers I 2, Hitachi 550 w/Grapple 1 Welders Maintenance Trailers 11) Hitachi 750 w/Grapple JX 1 Mechanics w/Service Trucks \o-y 1 Hitachi 1200 w/Grapple I Foreman Z Mobile Power Washer Burners LZ, Roll-Off Truck(s) 2. Laborers IX "2 Service Trucks Mechani cs lx Man Basket V 4 3 Oilers Tractor Trailer(s) 50 CY /O Operators Z Tractor Trailer(s) Low Bed Working Supervisors IX 1 Kobelco 850 I *2. I Safety Supervisors AX Melrose 853 Bobcat I Truck Drivers 1 Brokk 180 Robot IX 1 C < lA 2 H G Z L Brokk 250 Robot J_ U.I \I Z Generator(s) J_ Mbs. 12 \ Campbell Housfeld Compressor I 2. ADDITIONAL CHARGE FOR ABOVE WORK IS: $ Payment will be made as follows:

Above additional work to be performed under same conditioioAs as specif sd in original contract unless otherwise stipulated.

Authorizing Signature __________________________ ¥ • ▼ (OWNER SIGNS HERE)

We hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price. ^iM^rized Signature Date *^4£>**^ (CONTRACTOR SIGNS HERE)

THIS IS CHANGE ORDER NO. NOTE: This Revision becomes part of, and in conformance with, the existing contract. z CITY_2IMCl0 0_0 01298041 NYC-WTC_000279760

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279760Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000388127

Add'l work authorization for Trade Center project; shows contractor and job details.

Similar indexed content

Compare copies and versions →