NYC 9/11 Public Portal Document
'Pompkins Consolidated Area Transit Fixed Route Paratransit Rural
2000 Characteristics .Motor Bus Service Service Total
Revenue Passengers 2.2.30.530 47,667 .Ct 1.206 2.609,40.3
Number of Vehicles 39 17 17 7.3
Number of I'niployees 112 18 10 140
Revenue Vehicle Miles 1,169,486 243.628 215,204 1,628,.378
total Operating Revenue 2,262.37.3 16,321 4,201 2,282.89.5
Total Operating E.xpense 5.472.644 46.3 sx 40S,08.5 6,34.3.917
Operating Expense/Rev. Vehicle Mile 4.68 >0 1.90 3.90
Rev. Passengers / Rev. Vehicle Mile 1.91 0.20 1.54 1.60
Total Operating Revenue / Op. Expense 0.41 0.04 0.01 0.36
Operating Expense / Revenue Passenger 9.72 1.23 2.4.3
total Op. Revenue / Revenue Passenger I.(I I O..t4 0.01 0.87
consolidation, cloud the distinction in the specific nearly 244,000 in 2000. Over the five year period
urban/rural trends. But the trend for the total of fixed revenue miles grew at an annualized rate of 10.3
route service is one of strong ridership growth. percent, growing more slowly in 2000 by 5.8 percent.
Over the five year period from 1996 to 2000 total In 2000, TCAT completed its first calender year of
system ridership grew at a 2.1 percent annualized rate, operating new bus routes, implemented in August,
with another strong year in 2000, where TCAT’s 1999. TCAT’s new route system consolidated routes
systemwide ridership increased by 10 percent from formerly operated by the three separate operators and
2,374,580 to 2,619,144 trips. added new urban and rural service. Significant service
improvements include operating Sunday service in the
I'CAT’s paratransit system, as a component of the total urban area, adding three urban routes and one rural
system trend, has experienced particularly strong route.
growth. While demand responsive service was provided
by Gadabout in the Tompkins County area prior to Tompkins Consolidated Area Transit developed two
1990, complementary paratransit designed to meet the FTA Job Access and Reverse Commute (JARC)
requirements of the ADA was just beginning at the start proposals for $500,000, and $367,000 in Community
of the 1990s. As a result growth in STOA-eligible Solution for Transportation grant funds through the
paratransit ridership from the 1990 service to the more New York State Department of Labor. TCA f also
developed system operating by 2000 was dramatic, continues to plan a multi-modal downtown
rising from just under 1,500 to nearly 48,000 annual transportation center project.
trips. Over the five year period from 1996 to 2000
paratransit ridership increased at an annualized rate of TCAT’s fixed route fleet is growing both in number of
6 percent. Strong growth in 2000 outpaced the five year buses and in size of buses. TCAT is transitioning its
trend increasing by 11 percent. fleet from 3.5 foot long/96 inch wide/high floor buses to
40 foot long/102 inch wide/ low floor buses. The
System-wide, revenue vehicle miles, have risen since increase in the number of buses in the fleet, and the
1990 by an annualized rate of 1.4 percent. This increase increased size of some of the buses, is projected to
accelerated after consolidation, as reflected by the five require expansion of the TCAT bus maintenance and
year annualized increase of 3.3 percent. In 2000 the storage facility.
growth in miles slowed to .8 percent. Revenue vehicle
mile statistics have not been consistently reported The ratio of operating revenue to operating expenses, a
between the rural and urban fixed route modes from measure of service economy, increased from 33.7
year to year. percent in 1999 to 36 percent in 2000. This 6.8 percent
change resulted from the 15 percent increase in
The Gadabout paratransit revenue vehicle mile trend operating revenues outpacing the 8 percent increase in
roughly parallels the increase in riders, increasing from operating cost. Passenger revenues increased as a result
just over 9,()()() STOA-eligiblc miles in 1990 rising to of riticrship increases and a full year of the fare increase
III-137