Daily work force report, World Trade site, Dec 2001

Machine-extracted title · confidence 38%

Daily workforce and equipment listing for World Trade site, December 8, 2001.

NYC-WTC_000278992
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document I-

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone', N.Y. 11357-(718) 767-9000 DATE: SATURDAY DECEMBER 8, 2001 (NIGHT FINAL) . I DAILY Vi/ORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions COLD RAIN ALL NIGHT

Labor Equipment i CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT :_________________ 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER , CAT 973 LOADER 1 FOREMEN ; 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14__________ 4 HITACHI 550 GRAPPLER 1 LOCAL 15__________ ; 8 HITACHI 1200 GRAPPLER 1 CARPENTER_______ __ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS_______ 11 MECHANICS TRUCK 1 1 MECHANICS__________ TOOL TRUCK HOUSE WRECKERS i 6 TOOL VAN ROLL OFF EXCAVATED SOUTH TOWER DEBRIS TOWARDS WEST DUMP TRAILERS 8 LOADED TULLYS EUKES LOW BED TRAILER HOERAMMED CONCRETE ON REMAINS OF NORTH WALL HIGH DECK TRAILERS 2 1200 DOWN WHEN SHIFT STARTED - REPAIRED THEN WELDING TRUCK GRAPPLE BROKE - REPLACED WITH 750 FUEL TRUCK 1 RECEIVED NEW GRAPPLE FOR 1200 TONITE PICKUP TRUCKS 1 235 DAMAGED - FUEL TANK LEAKING AND HYDRAULIC LIGHT TOWERS 13 LEAK FROM UNDERCARFtAGE SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:_____________________________________________________________________________________ LOADS OUT: 64 LOADED 43 EUKES___________________________________________________ LOAD OUT STEEL AND DEBRIS______________________________________________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWBER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253_____________________________________________________________ DELAYS: GRACE CONTRACTING CORP Approved By: Title: ” BY: For: ~ SUPERINTENDENT

DAILY WORK FORCE REPORT1208N.xls

CITY_21MC100_0 06972362

NYC-WTC_000278992

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278992Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →