WTC contractor daily hazard report

Machine-extracted title · confidence 40%

Daily hazards and observations during West side construction at WTC.

NYC-WTC_000278839–000278840
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

WTC Daily Safety Report Report Penod 24 hours beginning 7 30 AM on 22-Apr-02 i iH* I

Observation/Hazard and Location Grid Contractor Corrective Action Required Person Contacted Response_______________________ Fall exposure at Memorial Cross J-barner on West side of T-13 Components Provide top rail {@ 42") above J-barriers Keith Irish Open Will bring to Components attention memorial area provide a seat resulting m inadequate fall protection TG-9 Loader back up light out________________________ Vesey Eroc Repair light_____ Charlie Keeling Open Will look at today Fall exposure from concourse level to plaza level on N/S haul T-11-12 Components Provide barricade David/Component Open road Tony-at 5 30 meeting

Laborers removing pushing debris off slab edge are not anchored properly One worker had two lanyards wrapped around a column a retractable attached to the lanyards Second worker had rope (B-3) & 1-4 Utilize anchorage that will not tear or break under the stress lanyard wrapped around cable attached to retractable (B-2) Tully of a fall Jeff Tasca/Brian Lyons Open - Jeff Tasca spoke with workers and they tied-off Struck by hazard from large chunk of concrete at leading edge of 1-5 Eroc Remove concrete piece Operator Open 0-2 West side Bldg #6 Insufficient ventilation for burners cutting electrical switches at J- N-5 Tully Increase ventilation with additional fan Extra fans available Foreman atJ-ramp Open, Foreman is addressing ventilation Additional fans should be ramp Fan in place but not enough air movement deep in WTC 5 through tunnel area Charlie Keeling - set into place _______ Tully_______ Poor ventilation deep in WTC 5 via J-Ramp Bobcats operating P-5 Tully Vent system in place but compressor is not operational J-ramp foreman Open, Foreman is addressing ventilation while air vents are not operational Compressor should be inspected and made operational when bobcats are working Wire rope cables not attached to jersey barriers on Liberty M-2 Bovis/Amec Install cables per engineered drawings Fall Jeff Tasca/Ray Open Street protection needed when building-up slurry wall flood Master protection Overhead struck by hazards on B-1 level of WTC 6 at areas Various Bovis/Amec Barricade B-1 work areas where slab is damaged above Ray Master Open where upper level slab is damaged or destroyed locations Remove hanging/spaled concrete at floor openings

Electrical wire spliced mto open junction box, poorly taped and T-9-10 S&J Check splice, properly tape and provide chase through wall Keith Irish Open passes over door Located by loading dock at J ramp for wire to pass Provide cover over Junction box

Fall from height-stair tower noof-4uilding-5 S-6 Components Step(s) needed to control the 19+" drop from the landing Open

Electrical - open slot in circuit panel box Bl, bldg 6 near the east M-3 S&J Install blank in open slot Open stairwell Fall potential on east slurry wall in wall break at 1 &9 Netting m P-15 Tully Tighten up cables and better secure netting at both top and John Krinia Open poor condition bottom Struck by hazard from HCB wall that has been broken loose East K-4 Eroc Remove loose HCB wall Operator Open side onB-5of#6 Prevent compressed gas cylinder from falling via restraints Compressed Gas Cylinders free standing not secured K-1D Bovis (chain, wire, etc) Jeff Tasca Open

Floor openings on upper deck of WTC 6 street level L-2 Bovis Cover holes and secure covers over openings in the deck Jeff Tasca Open Laborers removing pushing debris off slab edge are not wearing fall arrest equipment (B-3 (vl) M-4 Tully Have workers wear fall restraint which is properly anchored Jeff Tasca/Brian Lyons Open Fall Protection - Wire rope cables installed on jersey SiteWide Bovis/Amec Modify cables per engineered drawings and ensure Jeff Tasca. Jeff Ongoing barriers as fall arrest anchors should be modified per LZA- proper tie-off practices Melofchek, T SK-505/1 Romano Fall exposure on East haul road to mechanics level Opening S-10 Tully Provide barricade protection David- Component In progress Barricades being constructed created by removal of tank/cage near burning station Q Falls from height at WTC 6 8-1 stair tower_________________ 1-5 Bovis/Amec Barricade until landing/steps erected___________________ In progress Barricade provided and spotter in positioned K Fall hazards in Bldg 5 at various levels where walls have R-4 Components Inspect Bldg 5 below grade areas and add fall Jeff Tasca Closed Hole openings are protected I been removed around floor openings protection where there is an open edge of 6ft or more

Power source for stringer lights being tripped Generator located Q-4 S&J Connect lighting for this area to temporary lighting system Paul DiFrena Closed on concourse level tripping lights on Bl level of WTC 5 provided for WTC 5 O O Struck by hazard from pipe hanging above Northeast Stairwell at L-5 Eroc Remove pipe Operator Closed I Bldg 6 o o o co Oh cn Oh cn Liberty Mutual Loss Prevention 1 submitted 4/23/2002 7 48 AM

NYC-WTC_000278839

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278839Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

Similar document embedding; no shared entity or topic indexed. · similarity 0.909

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

WTC Daily Site Evaluation, Oct 23, 2001 · page 1

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

Similarity score 0.939 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000187868

Daily environmental safety evaluation report for the WTC site noting PPE issues, fall protection gaps, and structural cracks.

Similar indexed content

NYC-WTC_000302137

Daily safety evaluation listing issues at WTC sites AMEC and AMEX for action.

Similar indexed content

NYC-WTC_000407564

Daily site safety evaluation noting PPE, elevated hazards, and structural concerns at WTC sites; safety recommendations.

Similar indexed content

Compare copies and versions →