GRACE CONTRACTING CORP. 151-45 6th Road. WhHestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 11,2001 (NIGHT FINAL) 8PM DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & MILD
Labor ___________ Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 UXBORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 12 TOOL VAN ROLL OFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKEiJ HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADIN(3 OUT DEBRIS FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS_________ 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS FLASHING ARROW BOARD 1 USED 446 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 DELAYS: FLAT TRUCK 1 1200 DOWN FROM 11:45 TO 1:15 - RECOVERY PUMP 2 375 DOWN FROM 10:00 TO 10:30 - RECOVERY ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: WORK COMPLETED LOAD OUT STEEL AND DEBRIS 35 GRACE AREA MAN TAPPING AND TRIMMING STATIONS ____ 34 EUKES MAN WATER STATIONS FOR DUST C;ONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ELEVATIONS: ALL MACHINES LEVEl. B-5 253
GRACE CONTRACTING CORP Approved By; Title: BY: For: SUPERINTENDENT r DAILY WORK FORCE REPORT 1211N.xls
CITY_21MC100_004752854
NYC-WTC_000278675
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000291363
Night shift workforce and equipment at World Trade Center, Dec 12-13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291345
Day final daily workforce and equipment for World Trade Center, Feb 6, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432483
Night final daily workforce and equipment report for World Trade Center, Nov 30, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419098
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 28, 2001 (Day).
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237697
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291347
Daily workforce and equipment list for World Trade Center site, Feb 7, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360494
Day shift workforce and equipment roster for World Trade Center.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322147
Night final daily workforce and equipment roster for World Trade Center site, December 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360984
Night shift daily workforce and equipment at World Trade site, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429731
Night shift daily labor/equipment listing for World Trade Center, Dec 9, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305395
Night final daily workforce and equipment, World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000291363
Night shift workforce and equipment at World Trade Center, Dec 12-13, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291345
Day final daily workforce and equipment for World Trade Center, Feb 6, 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432483
Night final daily workforce and equipment report for World Trade Center, Nov 30, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419098
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 28, 2001 (Day).
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237697
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000291363
Night shift workforce and equipment at World Trade Center, Dec 12-13, 2001.
Similar indexed content
NYC-WTC_000291345
Day final daily workforce and equipment for World Trade Center, Feb 6, 2002.
Similar indexed content
NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similar indexed content
NYC-WTC_000432483
Night final daily workforce and equipment report for World Trade Center, Nov 30, 2001.
Similar indexed content
NYC-WTC_000419098
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 28, 2001 (Day).
Similar indexed content