NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Day final daily workforce report with labor classifications and equipment at World Trade Center.

NYC-WTC_000278620
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^CRACE CONTRACTING CORP. J^B-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 5, 2001 (DAY ) FINAL ss DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE —-i— OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375-GRAPPLER 1 LABORERS . . 24 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS______ 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 4 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER 1 ■ 185CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 11 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK 1 HOUSE WRECKERS 7 ' TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS 7 ■ LOW BED TRAILER LIVERIES: AWISCO ■ HIGH DECK TRAILERS 3 ABCO ■ WELDING TRUCK 1 ■ FUEL TRUCK 1 ‘ PICKUP TRUCKS 8 LIGHT TOWERS 13 " SITE MULE 3 " DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 “ OFFICE TRAILER/GENER. 1 CARGO BOXES 3 LIGHT TOWERS USED FOR 2.5 HOURS FLAT TRUCK ~ 1 [pump ~ 2 [roller ~ 1 “ RAINMAKER/GENIE LIFT 1

Description of Wcrk:______________ ________________________________________________________________________ DELAYS: 2:30-4:00 PM ALL WORK STOPPED_______________________________________________________________ LOAD OUT STEEL AND DEBRIS •________ ____________ ___________________________________________________ MANNED TARPING AND TRIMMING STATIONS ___________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________________ _________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS________________________________________________ ELEVATIONS: /.LL MACHINES LEVEL B-5 253______________________________________________________________ LOADS OUT 53 YUKE LOADS 35 GRACE CONTRACTING CORP __ lApproved By:

•i— BY: SUPERINTENDENT

DAILY WORK FORCE REPORT 1205D.xls

CITY_21MC100_004688226

NYC-WTC_000278620

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278620Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →