NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Daily workforce log for World Trade Center site showing labor and equipment allocations.

NYC-WTC_000278614
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

t

ii

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: December 8. 2001

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. j Weather Cone itions i

-■_______ Labor__________ Equipment I CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT i 2 CAT 966 LOADER 1 PROJECT ENiSINEER;__________________ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER : CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS : 23- HITACHI 750 GRAPPLER 1 IRON WORKERS ;__________________ 1 HITACHI 550 GRAPPLER. 1 LOCAL 14 i_____________ 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ■ FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: LOADS OUT: 76 LOAD OUT STEEL AND DEBRIS________ __________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS_________________________________________ ___________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS_________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: ' For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1208D.xls

CITY_21MC100_004688220

NYC-WTC_000278614

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278614Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →