NYC-WTC_000305046
Final daily workforce and equipment roster for World Trade Center project, December 2001.
3 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment at World Trade site, Dec 11, 2001.
NYC-WTC_000278608OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
I GRACE CONTRACTING CORP. 15M5 6th Road, Whitestoni;, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 11,2001 (DAY ) FINAL DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions I i __________________ ; Labor Equipment CLASSIFICATION QUANT. Description IMANNED [STANDBY IDLE SUPERINTENDENT ; 2 CAT 966 LOADER 1 PROJECT ENGINEER__________________ 2 CAT 446 BACKHOE 1 OFFICE ENGINEER I CAT 973 LOADER 1 FOREMEN i 1 CAT 365 GRAPPLER 1 SAFETY OFFICER i____________ ' 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 - . IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER ,_____________ 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN___________ 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 8 TOOL VAN ' 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: TRIBORO HARDWARE HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS g LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK DELAYS; ENTIRE JOB SHUT DOWN FOR 1 HOUR FLASHING ARROW BOARD 1 ' DUE TO MEMORIAL SERVICE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1
Description of Vi/ork:_____________________ ___________________________________________ DELA YS 1200 DOWN 11 AM ALL DAY TO SEARCH FOR PORT AUTHORITY POLICE OFFICER LOAD OUT STEEL AND DEBRIS________________________________________________ ' MANNED TARPING AND TRIMMING STATIONS________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_______________________________ _ MAINTAIN TR/TFIC FLOW IN AND OUT OF AREA______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS___________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253_________________________________________ LOADS OUT 50 YUKE LOADS 48 „ GRACE CONTRACT ;Ol Approved By; Title: ~ BY: x y For; ~ SUPERINTENDENT
DAILY WORK FORCE REPORT 1211D.xls
CITY_21MC100_004688214
NYC-WTC_000278608
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305046
Final daily workforce and equipment roster for World Trade Center project, December 2001.
3 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386650
Day shift daily workforce and equipment listing for World Trade site, Dec 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419110
Day shift workforce and equipment listing for World Trade Center, Dec 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408095
Daytime daily workforce and equipment listing for World Trade Center site, December 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361462
Day final daily workforce report for World Trade Center site on Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419325
Daily workforce and equipment entries for World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280098
Day shift daily workforce and equipment details for World Trade Center site, Dec 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305046
Final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386650
Day shift daily workforce and equipment listing for World Trade site, Dec 11, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419110
Day shift workforce and equipment listing for World Trade Center, Dec 11, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305046
Final daily workforce and equipment roster for World Trade Center project, December 2001.
Similar indexed content
NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
Similar indexed content
NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
Similar indexed content
NYC-WTC_000386650
Day shift daily workforce and equipment listing for World Trade site, Dec 11, 2001.
Similar indexed content
NYC-WTC_000419110
Day shift workforce and equipment listing for World Trade Center, Dec 11, 2001.
Similar indexed content