NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 414 pages

Ground Zero environmental health schools report

Machine-extracted title · confidence 45%

Document discussing lessons learned in children's environmental health related to Ground Zero sites.

NYC-WTC_000276036–000276449
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER U REGULATIONS OF THE COMMISSIONER § 155.5

be used only for a vapor, fine dust or air infiltration barrier, and shall not be used to separate occupied spaces from construction areas, (1) A specific stairwell and/or elevator should be assigned for construction worker use during work hours. In general, workers may not use corridors, stairs or elevators designated for students or school staff. (2) Large amounts of debris must be removed by using enclosed chutes or a similar sealed system. There shall be no movement of debris through haUs of occupied spaces of the building. No material shall be dropped or thrown outside the walls of the building. (3) All occupied parts of the building affected by renovation activity shall be cleaned at the close of each workday. School buildings occupied during a construction project shall maintain required health, safety and educational capabilities at all times that classes are in session. (g) Maintaining exiting and ventilation during school construction projects. The following information shall be included in all plans and specifications for school building projects; (1) A plan detailing how exiting required by the applicable building code will be main­ tained during construction. The plan shall indicate temporary construction required to isolate construction equipment, materials, people, dust, fumes, odors, and noise during the construc­ tion period. Temporary construction details shall meet code-required fire ratings for separation and corridor enclosure. At a minimum, required exits, temporary stairs, ramps, exit signs, and door hardware shall be provided at all times. A plan detailing how adequate ventilation will be maintained during construction. The plan shall indicate ductwork which must be rerouted, disconnected, or capped in order to prevent contami­ nants from the construction area from entering the occupied areas of the building. The plan shall also indicate how required ventilation to occupied spaces affected by construction will be maintained during the project. (h) Fire and hazard prevention. Areas of buildings under constmction that are to remain occupied shall maintain a certificate of occupancy. In addition, the following shall be strictly enforced: (1) No smoking is allowed on public school property, including construction areas. (2) During construction daily inspections of district occupied areas shall be conducted by school district personnel to assure that construction materials, equipment or debris not block fire exits or emergency egress windows. (3) Proper operation of fire extinguishers, fire alarm, and smoke/fire detection systems shall be maintained throughout the project. (i) Noise abatement during construction and tnaintenance activities. Construction and maintenance operations shall not produce noise in excess of 60 dba in occupied spaces or shall be scheduled for times when the building or affected building spaces are not occupied or acoustical abatement measures shall be taken. Noise level measurements (dba) shall be taken with a type 2 sound level meter in the occupied space in a location closest to the source of the noise. Complaints regarding excessive noise shall be addressed through the health and safety committee. The district should anticipate those times when construction noise is unacceptable and incorporate “no work” periods into the bid specifications. (j) Control of chemical fumes, gases, and other contaminants during construction and maintenance projects. The bid specifications and construction contracts for each construction project shall indicate how and where welding, gasoline engine, roofing, paving, painting or other fumes will be exhausted. Care must be taken to assure fresh air intakes do not draw in such fumes. (1) The bid specifications shall require schedules of work on construction and maintenance projects which include time for off-gassing of volatile organic compounds introduced during construction before occupancy is allowed. Specific attention is warranted for activities includ­ ing glues, paint, furniture, carpeting, wall coverings, and drapery. Manufacturers shall be contacted to obtain information regarding appropriate temperatures and times needed to cure or ventilate the product during use and before safe occupancy of a space can be assured. Building materials or furnishings which off-gas chemical fumes, gases, or other contaminants shall be

9-30-99 695 Education

CITY_21MC100_012173202

NYC-WTC_000276357

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276357Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →