NYC-WTC_000318340
Office findings on EPA response to World Trade Center issues; August 2003.
48 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Document discussing lessons learned in children's environmental health related to Ground Zero sites.
NYC-WTC_000276036–000276449OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Cleanup and ventilation work completed at PS/IS 89 (Jan 15. 2002) School Construction Authority oversees all cleanup and ventilation work at the school. BOE hired a set of certified, licensed environmental cleaning companies to clean the exterior, interior including furnishings and lockers and the HVAC systems.
Exterior of school completely cleaned
All roof ballast (gravel) removed, underlying insulation removed from flat roof areas (late Nov). Removal and cleaning of all dust that may have been blown onto the roof and settled under the gravel and insulation. New roofing materials installed on flat roof areas (Dec).
Power washing of the complete exterior of building (Dec) - all walls, roofs, windows, ventilation intake areas, etc.
Playground disassembled and cleaned
Preliminary power wash of play yard (early Dec). Full cleaning of play yard completed in late Dec. Includes removal and cleaning of ail rubber mats, cleaning under mats, cleaning surfaces. Removed and replaced a layer of soil in the yard. Similar work done on the small roof courtyard outside the library.
Central HVAC systems environmentally cleaned and upgraded
Ten central HVAC systems supply heat, ventilation, and air conditioning for the common areas, such as hallways, cafeteria, auditorium, gym, etc. All systems and ducts have been wiped and vacuumed (where reachable) and totally air-blasted and treated anti-bacterially (Dec).
New filter system was installed (Dec). Charcoal-activated 2”-wide pre-filters (Odor Guard ill), designed to eliminate 87% of airborne particles larger than 1 micron, has been installed to pre-filter the outside air prior to entering the 10 central HVAC units. A 2''-wide after-filter, 4-ply pleated, has been installed immediately downstream of the pre-filters as the air enters the duct system. The net result will be the elimination of 90-93% of airborne particles larger than 1 micron. The charcoal-activated pre-filter will also eliminate odors and VOCs. (This new system was successfully tested late Dec.)
Unit ventilators in every classroom environmentally cleaned and upgraded
Each classroom has 2 or 3 individual “incremental” ventilation units. Dismantled and cleaned all 93 units. Each univent was retrofitted from a 1” filter rack to a 2” filter rack to accommodate the Odor Guard III 2”- wide filter, thus providing the same filtration system as the central HVAC pre-filter. Tested 3 types of new filters (late Dec), and more lab tests are under discussion. Installed new “Odor-guard” filters (thicker than original) in all units (Dec/Jan).
Entire interior of school environmentally cleaned, including all contents
Thorough pre-cleaning of interior as first phase (Dec). Wet-wiping surfaces, cleaning with HEPA vacuum. Final environmental cleaning was completed for interior spaces (such as classrooms, library, gym, auditorium, etc.), including contents (rugs, books, papers, etc.) (Jan). Additional custodial cleaning (Jan).
Testing will continue Daily air quality testing and monitoring inside and outside. Monitoring and testing of appropriate substances will continue, similar to what has been done at Stuyvesant.
lEnvironmental Cleanup and Preparation of PS/IS 89 -PAGE 1 - 1/15/02|
CITY_21MC100_012173161
NYC-WTC_000276316
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000318340
Office findings on EPA response to World Trade Center issues; August 2003.
48 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000319809
Document describing MS/PS 85M occupancy and recovery operations related to WTC.
33 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
36 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106411
Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.
13 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
28 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000144546
Internal memo directing DEP employees to preserve all records related to the World Trade Center attacks and subsequent environmental cleanup.
16 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
39 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453548
Board of Education disaster response summary for schools near WTC site.
27 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000144741
Standard administrative notice requiring the retention of original World Trade Center records as evidence for future legal actions.
34 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
14 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
48 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138950
Draft excerpts of EPA OIG report for NYC interactions.
20 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000418809
Memo detailing Phase 1 and Phase 2 cleaning, PCM/ TEM monitoring logistics for a school project.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000276652
Table of contents for contaminants of [name] report and building sections.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437074
SCA memo documenting pre-cleaning and post-cleaning phases at Stuyvesant HS site.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437018
Phase 1 and Phase 2 pre-cleaning and surgical cleaning plan for WTC project floors; TEM air monitoring referenced.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420344
Memo detailing phases of preliminary and final interior cleaning at the school, including areas cleaned and monitoring.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similar indexed content
Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.
Similar indexed content
NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
Similar indexed content
NYC-WTC_000144546
Internal memo directing DEP employees to preserve all records related to the World Trade Center attacks and subsequent environmental cleanup.
Similar indexed content
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
Similar indexed content