NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 414 pages

Ground Zero environmental health schools report

Machine-extracted title · confidence 45%

Document discussing lessons learned in children's environmental health related to Ground Zero sites.

NYC-WTC_000276036–000276449
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ahsan Z. Farooqi -8- November 12 2001

One additional modification recommended to the Scuyvesant progcam relaces co cite screening level being used for silica/mineral dust. The Stuyvesant program cites OSHATablc 1910.1000 Z-3 for rhe limit for silica/mineral dust; however, that table does not provide rhe most stringent limit for silica/mineral dust. The OSHA permissible exposure limit ("PEL") is 10 milligrams of silica per cubic meter of air (10 mg/n?) averaged over an 8-hour work shift. In addition, workers cannot be exposed to more chan a tocal of 30 milligrams of silica per cubic meter of air (30 mg/ m’) over an 8-hour shift. The National Institute for Occupational Safety and Health (NIOSH) has a recommended exposure limit char is much lower than the OSHA permissible exposure limit. NIOSH recommends that worker exposure be less chan 0.05 mg/ m’ for up co a I O-hour workday, or 40-hour worltwcek. As a conseivative measure, the lower exposure limic should be the target value for silica.

In the event that elevated asbestos levels are found within the school, the cause should be assessed and che school appropriately decontaminated in accordance with appropriate protocols. Final clearance sampling would then be necessary. If iinsatisfiictory results are obtained outside the school on any day, the New York City Board of Healtli and the USEPA should be contacted to attempt to identify the causes. Windows at the school should remain closed at all times. Consideration needs to be given co potential modifications co the HVAC system of the school in order to increase the systems ability to filter out pai-ciculates and volatile organic compounds

ENVIRON recommends that a facility-specific contingency plan for P.S. 234 be developed following the collection of the Phase 1 and Phase 2 data and prior co reopening the school.

Phase 3 Post-Reopening Monitoring

Ac this time we suggesc chac che modified Scuyvesant protocol as clarified above, be the assumed scope of work for the on-going monitoring activities at P.S. 234. Based on the results of the sampling conducted in Phases 1 and 2, and based On sice conditions at and near Ground Zero, however, revisions to the modified Stuyvesant approach may be suggested.

CITY_21MC100_012173134

NYC-WTC_000276289

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276289Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →