Asbestos air test results, 53 Park Place, Nov 2001

Machine-extracted title · confidence 25%

Summary of asbestos air testing results for 53 Park Place, including sampling dates and locations.

NYC-WTC_000275378–000275381
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary ofAsbestos Sampling Results Page 3 of 4 Address: 53 Park Place Date sampled: November 14, 2001

Results of Transmission Electron Microscopy (TEM) testing of air at 53 Park Place, Nov. 14, 2001 Area Sampled Sample Number Residence 1 A-Rl-1 =l Concentration of Asbestos Fibers in Air at 53 Park Place (fee)* <0.001

Concentration of All Fibers in Air at comparison locations (f/cc) <0.001 to 0.003 Re-occupancy Standard (f/cc) ** NYC___________________________________________ 0.01 ________ _ * f/cc is fibers in each cubic centimeter (cc) of air. This is calculated from the number of fibers seen on the air filter and the volume of air pulled through the filter measured in cubic centimeters. **New York City Department of Environmental Protection asbestos clearance criteria for post-abatement work (Rules of the City of New York, Title 15, Chapter 1)

ASBESTOS DUST TEST RESULTS In general, the dust and debris samples were examined by two different laboratory methods for asbestos fibers. Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM). PLM is used to define asbestos containing material in dust and debris. A material is considered to be asbestos containing material if it contains more than 1% asbestos using the PLM method. The PLM method only counts the larger asbestos fibers. Therefore, if results by PLM were not greater than 1% asbestos, the sample was then analyzed by the TEM method that does count the smaller fibers. However, TEM analysis is not used for regulatory purposes for dust samples.

No asbestos fibers were found in the dust samples from the area outside your building or in the two residences. TEM analysis was not conducted on these samples due to insufficient amounts of sampled dust. No dust was available for analysis in the common area, which had been cleaned after September 11*.

Fibrous materials in dust found by PLM analysis: Polarized Light Microscopy identifies asbestos fibers by shape and optical characteristics. Other fibers such as fabric (synthetics), paper (cellulose) and fiberglass may be identified in the analysis. The laboratory analyst counts the fibers present to give an estimate of fiber content. PLM is used for regulatory purposes for dust samples.

CITY_21MC100_011108668

NYC-WTC_000275380

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000275380Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →