Daily workforce report, World Trade, Jan 3, 2002

Machine-extracted title · confidence 24%

Day final daily workforce and equipment at World Trade, Jan 3, 2002.

NYC-WTC_000269227
Page image
Scanned page image, NYC-WTC_000269227
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: JANUARY 3, 2002 DAY (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 25 CAT 375 GRAPPLER 1 IRON WORKERS 1 HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 6 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:______________________________________________________________________________ ANTICIPATED WORK___________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL__________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________________ 2 MACHINES AT LEVELS B-5, 2 MACHINES AT LEVEL B-6; EL 242______________________________________ CONTINUE ON B-6 IN MER ROOM & REMOVE ALL PIPING ON B-6 LOADS OUT: 52_____________________ YUKESOUT: 121

GRACE CONTRACTING CORP| Approved By: BY; Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 0103D.xls

CITY_21MC100_003249479

NYC-WTC_000269227

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000269227Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →