NYC-WTC_000419103
Daily workforce and equipment listing for World Trade Center site, Dec 7, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce report for World Trade; crews and machinery listed.
NYC-WTC_000269218OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GJRACE CONTRACTING CORP. 151-45 6th Road, Whltastono. N.Y. 11357-(718)767-9000 DATE; TUESDAY 12/26/01 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Il Equipment CLASSIFICATION QUANT. ]) Description MANNED STANDBY IDLE SUPERINTENDENT 1 lIcAT 966 LOADER 1 PROJECT ENGINEER 1 lIcAT 446 BACKHOE 1 OFFICE ENGINEER I CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 2 LABORERS 23 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER ? LOCAL 15 9 HITACH11200 GRAPPLER 1 . CARPENTER 1 185 CFM COMPRESSOR T CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 IIteamsters 1 MECHANICS TRUCK 2 MECHANICS 3 IITOOL TRUCK HOUSE WRECKERS 8 TOOL VAN 1 !|rOLL OFF UdUMP TRAILERS LOW BED TRAILER [DELIVERIES: AWISCO UhIGH DECK TRAILERS r~ BLACK BEAR jwELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 IlIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK IFLASHING arrow BOARD 1 OFFICE TRAILER/GENER. ~ 1 CARGO BOXES 4 FIAT TRUCK 1 |PUMP 2 [roller 1 rainmaker/genie lift 1 =!J Description of Work; COMPLETED WORK_________________________________________________________________________ MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA ____________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANY , MANNED WATERING STATIONS FOR DUST CONTROL __________________________ __________ , ■ LEVELS B-S, EL253__________________________________________________________________________ YUKESOUT; 143* ~ LOADS OUT: 86* • MISSING TRUCK LOGS FOR DAY SHIFT ACTIVITY IN BOVIS SECTOR / GRACE CONTRACTING CORP Approved By. TitlKr' -.YY- Yv BY: Fon.;,;Y,.'Y'Y.- SUPERINTENDENT
: daily work FORCE REPORT1226D yte < " CITY_21MC100_005019474
NYC-WTC_000269218
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419103
Daily workforce and equipment listing for World Trade Center site, Dec 7, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361467
Night final daily workforce report for World Trade Center site on Dec 7, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356716
Daily workforce and equipment at World Trade Center project, Nov 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269225
Night preliminary daily workforce and equipment at World Trade site, early Jan 2000s.
3 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407415
Daily workforce roster and equipment list for World Trade Center project site, detailing crew roles and machine usage for Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322141
Final daily workforce and equipment inventory for World Trade Center site, December 7, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280787
Night shift daily workforce report for World Trade site, Dec 20 2001.
2 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419265
Daily workforce and machinery listing for World Trade Center site, Jan 1, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280805
Daily workforce and equipment listing for World Trade project, Jan 2, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268600
Daily labor roster listing classifications and equipment for a construction site.
3 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268597
Daily labor roster listing classifications and equipment for a construction site.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305030
Final daily workforce and equipment for World Trade site, Nov 21, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419103
Daily workforce and equipment listing for World Trade Center site, Dec 7, 2001.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361467
Night final daily workforce report for World Trade Center site on Dec 7, 2001.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356716
Daily workforce and equipment at World Trade Center project, Nov 27, 2001.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269225
Night preliminary daily workforce and equipment at World Trade site, early Jan 2000s.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407415
Daily workforce roster and equipment list for World Trade Center project site, detailing crew roles and machine usage for Jan 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322141
Final daily workforce and equipment inventory for World Trade Center site, December 7, 2001.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419103
Daily workforce and equipment listing for World Trade Center site, Dec 7, 2001.
Similar indexed content
NYC-WTC_000361467
Night final daily workforce report for World Trade Center site on Dec 7, 2001.
Similar indexed content
NYC-WTC_000356716
Daily workforce and equipment at World Trade Center project, Nov 27, 2001.
Similar indexed content
NYC-WTC_000269225
Night preliminary daily workforce and equipment at World Trade site, early Jan 2000s.
Similar indexed content
NYC-WTC_000407415
Daily workforce roster and equipment list for World Trade Center project site, detailing crew roles and machine usage for Jan 2002.
Similar indexed content