NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Jan 2001

Machine-extracted title · confidence 41%

Night preliminary workforce and equipment for World Trade Center site.

NYC-WTC_000269198
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 787-9000 DATE: 1/2/01 NIGHT PREI IMINARY

DAILY WORK FORCE REPORT

Job Nams & Location: World Trade Center Contract No. Weather Conditions

SUPERINTENDENT Labor CLASSIFICATION = QUANT. 2 t luipment Descri)lIlion MANNED STANDBY IDLE 1 PROJECT ENGINEER 1 CAT 446 BACK tOE 1 OFFICE ENGINEER |CAT 973 LOAD =R 1 FOREMEN 3 CAT 375 BUCK :T 1 SAFETY OFFICER CAT 375 GRAf ’LER 1 Laborers 19 [HITACHt 750 C KAPPLER 1 IRON workers HitACHI 550 C UPPLER 1 local 14 5 [HITACHI 550 C RAPPLER 1 LOCAL 15 8 HITACH11200 3RAPPLER 1 CARPENTER 185CFMCOM ’RESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS 1 ;UCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOL VAN ROLL OFF DUMP TRAILE ^S LOW BED TR4 ILER HIGH DECK TOILERS DELIVERIES: WELDING TR^CK FUEL TRUCKt 1 PICKUP TRUCKS 3 LIGHT TOWEItS 13 SITE MULE { ' 3 DUMP TRUCKS 10 WHEEL dOmP TRUCK FLASHING ARROW BOARD' 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 1 ROLLER RAINMAKER/GENIE LIFT 1 ,, , ---------- --- . -I . .... — ...... Description of Work: PRELIMINARY/ANTiCIPATED WORK________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATtONS FOR DUST CONTROL____________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA__________________________________________________ 2 MACHINES AT LEVEL B5. 2 MACHINES AT LEVEL B6: EL 242_________________________________________ CONTINUE ON B6 IN MER ROOM AND REMOVE ALL PIPING IN B6

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0102N.xls

CITY_2IMCl0 0_0 00 0 20002 NYC-WTC_000269198

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000269198Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →