Daily work force report, World Trade Center, Dec 2, 2001

Machine-extracted title · confidence 41%

Night preliminary workforce and equipment at World Trade Center site.

NYC-WTC_000269190
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 15MS sth Road, WhKsatone, N.Y. 1t3S7-(718) 7674000 DATE: SUNDAY 12/2/01 NIGHT PRELIMINARY

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions T Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOLVAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work: _____________________________________________________ PRELIMINARY/ANTiGtPATED WORK _________________________________ 235 HAMMER IS REMOVING CONCRETE WALL AROUND THE ViSTA ELEVATOR SHAFTR______ CONTINUED BUIDING RWIilP FROM NORTHWEST APPROACH___________________________ MANNED TARPtNG AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 PREP FOR THE BURNiNG OF THE NORTHWEST CORNER COLUMN BEAMS

GRACE CONTRACTING CORP Approved By: Tide: ~ BY: For: SUPERINTENDENT 2

CITY_2IMCl0 0_0 0 0 019 9 9 3 NYC-WTC_000269190

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000269190Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →