NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce and equipment at World Trade Center.
NYC-WTC_000269189OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357-(718) 767-8000 DATE: DECEMBER 6, 2001 (NIGHT FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 e HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 1 1 MECHANICS 1 TOOLTRUCK 1 HOUSE WRECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: LOADS OUT: 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS___________________________________________________ LOAD OUT STEEL AND DEBRIS____________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS MAN WATER STATIONS FOR DUST CONTROL______________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE NORTH WALL COLUMNS______________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253_______________________________________________________________ DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY;___________________________ FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED._________________________________________ GRACE CONTRACTING CORP Approved By: Title: BY: / Tori SUPERINTEND^
DAILY WORK FORCE REPORT 1206N.xls
CITY_21MC100_000019991 NYC-WTC_000269189
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388372
Night shift daily workforce and equipment at World Trade site, Dec 6, 2001.
5 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305229
Day final daily workforce and equipment at World Trade site, Dec 3, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361465
Night final daily workforce report for World Trade Center site on Dec 6, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419243
Weekly daily workforce and equipment roster for World Trade site, December 6, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388368
Night shift daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280004
World Trade Center workforce and equipment data for December 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388372
Night shift daily workforce and equipment at World Trade site, Dec 6, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305229
Day final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
Similar indexed content
NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similar indexed content
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
Similar indexed content
NYC-WTC_000388372
Night shift daily workforce and equipment at World Trade site, Dec 6, 2001.
Similar indexed content