NYC-WTC_000305514
Night FINAL daily workforce and equipment for World Trade Center project, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Night shift labor/equipment report for World Trade Center, Feb 11, 2002.
NYC-WTC_000268651OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. l51^56lhRoad. Whitestone. N.Y. 11357-(718) 787-9000 DATE: 2/11/02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center^ Contract No. Weather Conditions \
Labor I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 PROJECT ENGINEER 1 CAT 375 BUCKET 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS___________ 14 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 1200 GRAPPLER 1 LOCAL 14 4 185 CFM COMPRESSOR ■SEE NOTE LOCAL 15____________ 6 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 1 1 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 1 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES: WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 NOTE: 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 SITE MULE 3 16 TEAMSTERS ( 12 DUMP TRAILERS ) DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work: COMPLETED WORK I CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE 1 HOUR DELAY DUE TO TRUCK WASH SHUT DOWN TO CLEAN GRATES TRUCK 75 FLIPPED OVER AT PIER 25 AT 3AM DUE TO OVER LOAD BY TULLY MACHINE & FROZEN DEBRIS. DRIVER TAKEN BY EMS TO ST.VINCENTS HOSPITAL. TRUCK UPRIGHTED & PARKED BY BBT
GRACE CONTRACTING CORP Approved By: Title: For;
SUPERINTENDENT K
CITY_21MC100_0 09224536
NYC-WTC_000268651
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305514
Night FINAL daily workforce and equipment for World Trade Center project, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268613
Daily workforce and equipment roster for World Trade Center site, listing crew and equipment details.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361530
Night shift daily workforce and equipment at World Trade site, Feb 11 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429468
Night final daily workforce and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291352
Night shift workforce and equipment at World Trade Center, Feb 11, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419191
Daily staffing and equipment usage report for World Trade Center construction site.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305133
Night shift daily workforce and equipment at World Trade site, Feb 11, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322134
Night daily workforce and equipment roster for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237702
Night shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280854
Night final daily workforce report for World Trade Center construction, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268621
Daily workforce and equipment roster for World Trade Center site, listing crew and machinery.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305514
Night FINAL daily workforce and equipment for World Trade Center project, February 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268613
Daily workforce and equipment roster for World Trade Center site, listing crew and equipment details.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361530
Night shift daily workforce and equipment at World Trade site, Feb 11 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429468
Night final daily workforce and equipment at World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291352
Night shift workforce and equipment at World Trade Center, Feb 11, 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419191
Daily staffing and equipment usage report for World Trade Center construction site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305514
Night FINAL daily workforce and equipment for World Trade Center project, February 2002.
Similar indexed content
NYC-WTC_000268613
Daily workforce and equipment roster for World Trade Center site, listing crew and equipment details.
Similar indexed content
NYC-WTC_000361530
Night shift daily workforce and equipment at World Trade site, Feb 11 2002.
Similar indexed content
NYC-WTC_000429468
Night final daily workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000291352
Night shift workforce and equipment at World Trade Center, Feb 11, 2002.
Similar indexed content