NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 38%

Daily labor and equipment assignments for World Trade Center project site, Feb 7, 2002.

NYC-WTC_000268645
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 15145 61h Road, Whitestone, N.Y, 11357-(718) 767-9000 DATE; 2/7/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. ! Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 ICAT 966 LOADER 1 PROJECT ENGINEER_______________________ 2 CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 BUCKET 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 14 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACH11200 GRAPPLER 1 LOCAL 14 4 185 CFM COMPRESSOR •SEE NOTE LOCAL 15 6 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN 2 TOOL TRUCK 1 TEAMSTERS (FUEL) TOOL VAN 1 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 15 ROLL OFF MECHANICS 2 DUMP TRAILERS 8 HOUSE WRECKERS LOW BED TRAILER HIGH DECK TRAILERS 2 1?1 WELDING TRUCK________ _1_ FUEL TRUCK 1 DELIVERIES: AWISCO PICKUP TRUCKS 8 LIGHT TOWERS 5 NOTE: LIGHT TOWERS USED 2.5 HOURS SITE MULE 3 185 CFM COMPRESSOR RAN UNMANNED DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 •NOTE: TRUCK 62 IS BEING USED BY TULLY FROM 2:30 TIL CARGO BOXES 4 END OF SHIFT. FLAT TRUCK TRUCK 99 IS USED BY TULLY ALL DAY UNDER PUMP 2 THE PEDESTRIAN BRIDGE T

FLASHING ARROW BOARD PLACED AT PIER 25 AT 1:30 PM

1[ Descripiion of Work:__________________________________________________ COMPLETED WORK_________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA___________________ CONTINUED LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 77____________________________________________________ J JI EUKESOUT; 121 1 j

GRACE CONTRACTING CORP Approved By; BY: Title: For: superintendent I

RPPCRTaCZL'.Ais

CITY_21MC100_005009985

NYC-WTC_000268645

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000268645Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →