NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
NYC-WTC_000268616OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11367-(718) 767-9000 DATE: 2/12/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor II Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 ■ CAT 966 LOADER 1 FOREMEN 1 ' CAT 365 GRAPPLER 1 PROJECT ENGINEER 2 ■ CAT 375 BUCKET 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER 1 LABORERS 14 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI 1200 GRAPPLER 1 LOCAL 14 4 ■ 185 CFM COMPRESSOR •SEE NOTE LOCAL 15 5 ■ 235 HAMMER HOE RAM 1 CARPENTER ■ MECHANICS TRUCK 2 CARPENTER FOREMAN 1 ■ TOOL TRUCK TEAMSTERS (FUEL) 1 ■ TOOL VAN MECHANICS 2 ' ROLL OFF HOUSE WRECKERS ■ DUMP TRAILERS ■ LOW BED TRAILER ■ HIGH DECK TRAILERS DELIVERIES: ■ WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 NOTE; 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 SITE MULE 2 14 TEAMSTERS ( 10 DUMP TRAILERS, 4 EUKES ) DUMP TRUCKS 10 WHEEL DUMP TRUCK *NOTE: TRUCK 63 WAS BEING FILLED WITH DIRT FROM THE FLASHING ARROW BOARD TRENCH WORK AT LIBERTY & WEST. WILL NOT DO AS OFFICE TRAILER/GENER. 1 MANY LOADS AS THE OTHER TRUCKS CARGO BOXES 4 FLAT TRUCK DELAYS; TRUCK 99 WAS DOWN FROM 10:00 AM TO 12:00 PM PUMP 2 WITH AIR TANK PROBLEM, & TRUCK 67 WAS DOWN FROM 11:00 TO 12:30 PM WITH NO HEADLIGHTS & A FLAT TIRE
Description of Work;
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 77
GRACE CONTRACTING CORP Approved By: BY; Title: 4; Xoo/C c For: SUPERINTENDENT T
DAILY WORK FORCE REPORT0212D.xls
/if ‘i- ■
"Si
CITY_21MC1OO_OO352O553 N YC-WTC_000268616
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419054
Daily workforce report for World Trade Center site; labor and equipment details.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291354
Night shift workforce and equipment for World Trade Center, Dec 13-15 2001.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305171
Night final daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305135
Day shift daily workforce and equipment at World Trade site, Feb 13, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278714
Daily labor roster for World Trade Center site showing personnel, roles, and equipment (Mar 1, 2002).
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251809
Daily workforce report listing crew and equipment at World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356562
Daily labor/equipment roster for World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419054
Daily workforce report for World Trade Center site; labor and equipment details.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
Similar indexed content
NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content
NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
Similar indexed content
NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similar indexed content
NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
Similar indexed content