Daily workforce report, Grace Contracting, Dec 20 2001

Machine-extracted title · confidence 28%

Day shift final daily workforce and equipment assignments for World Trade Center.

NYC-WTC_000268599
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

/ )

GRACE CONTRACTING CORP. 151-45 6th Road, Whiteslono, N.Y. 11357-(718) 767-8000 DATE: DECEMBER 20. 2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment =sssssss CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 27 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 9 TOOLVAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER [DELIVERIES: AUSTER RUBBER HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 BLACK BEAR CO. FUEL TRUCK 1 TRIBORO HARDWARE PICKUP TRUCKS 9 LIGHT TOWERS 13 ] SITE MULE ~ 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:________ ____________ ____________ ____________________________________ DELAYS: 1200 4 HOUR DELAY SEARCH AND RECOVERY MANNED TARPING AND TRIMMING STATIONS________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MANNED WATERING STATIONS FOR DUST CONTROL_______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT 94 YUKE LOADS 100

ingcor/^ )

yx GRACE CONTI Approved By: TiUe:_______ For: SUPERINTENDENT

I J DAILY WORK FORCE REPORT 1220D.xls

CITY_21MC100_003574228

NYC-WTC_000268599

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000268599Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →