Daily workforce report, Grace Contracting, Dec 21 2001

Machine-extracted title · confidence 28%

Day shift final daily workforce and equipment assignments for WTC site.

NYC-WTC_000268598
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-(5 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 21, 2001 (NIGHT ) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions PARTLY CLOUDY AND SEASONABLY COOL

[ Labor Equipment CLASSIFICATION QUANT. 1| Description MANNED STANDBY IDLE ISUPERINTENDENT 2 ■ CAT 966 LOADER 1 PROJECT ENGINEER 1 ' CAT446 BACKHOE 1 loFFICE ENGINEER ■ CAT 973 LOADER • 1 FOREMEN 2 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 16 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 BACKHOE 1 LOCAL 15 8 HITACHI 550 GRAPPLER 1 CARPENTER HITACH11200 GRAPPLER 2 CARPENTER FOREMAN 185 CFM COMPRESSOR 1 TEAMSTERS 1 235 HAMMER HOE RAM 1 MECHANICS 1 MECHANICS TRUCK 1 1 HOUSE WRECKERS 4 TOOL TRUCK IItool van . ROLL OFF DUMP TRAILERS DELIVERIES: CAT 345, GRAPPLE LOW BED TRAILER 2 - 375 ON JOB WORKING TONITE. ONE 375 WAS LOADING HIGH DECK TRAILERS OUT VISTA INTO EUKES/ FLATS I WELDING TRUCK SECOND 375 WAS LOADING EUKES WITH MATERIAL BEING FUEL TRUCK 1 PASSED TO IT BY THE 1200 PICKUP TRUCKS 2 1200 WAS EATING INTO THE VISTA - SE CORNER. LIGHT TOWERS 13 750 WORKING IN VICINITY OF CHILLER ROOM PASSING SITE MULE 3 DEBRIS TO GATEWAY - LOADING EUKES. DUMP TRUCKS 10 WHEEL DUMP TRUCK NYL 71 FLATBED WAS DAMAGED BY MAZZOCHI PUTTING FLASHING ARROW BOARD 1 TOO LARGE A PIECE OF STEEL ON FLAT. OFFICE TRAILER/GENER. 1 CARGO BOXES 4 CONFUSION AS TO WHERE TO DUMP TRAILERS (HAMILTON FLAT TRUCK 1 OR PIER 25) CAUSED A TRUCKING DELAY 3 TRUCKS 4 HRS PUMP 2 2 TRUCKS 3 HOURS - SEE ATTACHED MEMO ROLLER 1 TRUCKING ON SEPARATE SHEET, RAINMAKER/GENIE LIFT 1 Description of Work:

MAN TARPING AND TRIMMING STATIONS MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL _______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LEVELS B-5, EL 253 ~ "

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT /•/

DAILY WORK FORCE REPORT 1221N.xls

CITY_21MC100_003574173

NYC-WTC_000268598

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000268598Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →