DOT Queens Boulevard/Honeywell Street newsletter, July 2001

Machine-extracted title · confidence 44%

Project newsletter describing reconstruction progress on Queens Boulevard and Honeywell Street Bridges

NYC-WTC_000267431
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

QUEENS BOULEVARD BRIDGE / HONEYWELL STREET BRIDGE NEWSLETTER #3 RECONSTRUCTION PROJECT (Contract No: HBQ448 & HBQ432) JULY 2001

RECONSTRUCTION OF THE QUEENS BOULEVARD AND HONEYWELL STREET BRiDGES In April 2001, the New York City Department of Transportation (NYCDOT) began the reconstruction of the Queens Boulevard Bridge. Inspection of the bridge revealed that the structural steel supporting the bridge, roadway surface and bridge joints have severely deteriorated due to the effects of age, weather and increased traffic. Presently, the south portion of the bridge is closed for Stage 1 reconstruction. The DOT is in the process of removing and replacing the existing concrete deck and bridge steel.

The Honeywell Street Bridge is not in service, because it did not meet the DOT safety standards. Protective Shielding is currently being installed. Preparatory work for the onset of reconstruction is currently underway. Demolition of the bridge is scheduled to begin in August 2001.

The DOT has entered into an expedited contract and the project, currently on schedule, is slated to be completed in Fall 2002. By that time, both the Queens Boulevard and Honeywell Street Bridges will be completely rebuilt and reopened to traffic.

New Traffic Pattern on Queens Boulevard Bridge: During reconstruction, the Queens Boulevard Bridge is closed to Queens-bound traffic at all times. The bridge is open to Manhattan-bound traffic only. However, the number of available travel lanes is reduced from three (3) lanes to two (2). Queens-bound traffic follows a carefully planned and clearly marked detour that was designed to minimize impacts IE on area businesses, the local community, and the traveling public. s Work Completed as o f Juns 30, 2001: Prciect o;? Q'jssns Boulevard Bridge QUEENS BOULEVARD BRIDGE: • Amtrak overhead catenary (electrical) system including • New bridge steel. new foundations and structural supports have been • New sidewalks including a walkway/bikeway separated constructed. The A.mtrak catenary system has been from traffic by concrete barrier. relocated. • New and improved overhead lighting system. • South half of the bridge is closed using concrete barriers and chain-link fence for Stage 1 reconstruction. • Intelligent Transportation System (ITS) is installed. Red J • New traffic signals and traffic signs are installed as part of An Intelligent Transportation System (ITS System) has the detour plan. been installed to assist motorists in navigating through the • More than one half of the structural steel and deck slab community. As part of the ITS System: has been removed. • Nine (9) Closed Circuit TV (CCTV) cameras are installed • Existing pedestrian fence has been removed. to monitor traffic and roadway conditions. • West sidewalk has been removed. • Nine (9) Electronic Message Boards provides motorists • Existing gas main has been removed. with real-time traffic information. • Gantry crane has been erected. • More than 500 traffic signs are installed in and around the area to guide motorists. HONEYWELL STREET BRIDGE: • Plan for the deployment of Traffic Enforcement Agents has • More than one half of Amtrak overhead catenary been developed and implemented. Thirty-five (35) Traffic (electrical) steel erection system completed. Enforcement Agents per shift are strategically placed at • More than eighty percent of Protective Shielding has been various intersections to help keep a smooth flow of traffic installed. in and around the area. • Designated tow truck service is onsite to assist any motorists in need, at no cost to motorists. Smurovsments to the Queens Boulevard & Honeywell Street Bridges: H9esing YoL.informed: Both bridges will undergo a complete reconstruction. Over the NYCDOT’s Community Liaison, Ms. Nareesa Nabibaksh, will course of this project, the major improvements will include: respond to all project-related inquiries and provide information • Reconstruction of concrete abutments, crash walls and about the project. Ms. Nabibaksh can be reached at (718) steel piers. 433-1687. NYCDOT will continue to issue newsletters, travel • Installation of new concrete decks and approach advisories, and project updates during the course of the pavement. project.

NEW YORK CITY NEW YORK CITY DEPARTMENT OF TRANSPORTATION Division of Bridges - Bureau of Roadway Bridges ■■r ''Vr ■ New York City City of New York Department of Transportation Rudolph W. Giuliani Iris Weinshall Mayor Commissioner

NYC-WTC_000267431

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000267431Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Bridge project newsletter, 2001

NYC-WTC_000267430

Overview of ongoing Queens Boulevard/Honeywell Street Bridge reconstruction efforts.

Similar indexed content

Compare copies and versions →