QUEENS BOULEVARD BRIDGE / HONEYWELL STREET BRiDGE newsletter #3 RECONSTRUCTION PROJECT (Contract No: HBQ448 & HBQ432) | 2001 RECONSTRUCTION OF THE QUEENS BOULEVARD AND HONEYWELL STREET BRIDGES In April 2001, the New York City Department of Transportation (NYCDOT) began the reconstruction of the Queens Boulevard Bridge. Inspection of the bridge revealed that the structural steel supporting the bridge, roadway surface and bridge joints have severely deteriorated due to the effects of age, weather and increased traffic. Presently, the south portion of the bridge is closed for Stage 1 reconstruction. The DOT is in the process of removing and replacing the existing concrete deck and bridge steel.
The Honeywell Street Bridge is not in service, because it did not meet the DOT safety standards. Protective Shielding is currently being installed. Preparatory work for the onset of reconstruction is currently underway. Demolition of the bridge is scheduled to begin in August 2001.
The DOT has entered into an expedited contract and the project, currently on schedule, is slated to be completed in Fall 2002. By that time, both the Queens Boulevard and Honeywell Street Bridges will be completely rebuilt and reopened to traffic.
New Traffic Pattern on Queens Boulevard Bridge: During reconstruction, the Queens Boulevard Bridge is closed to Queens-bound traffic at all times. The bridge is open to Manhattan-bound traffic only. However, the number of J available travel lanes is reduced from three (3) lanes to two (2). Queens-bound traffic follows a carefully planned and clearly marked detour that was designed to minimize impacts on area businesses, the local community, and the traveling public.
kVork Completed as of June 3C, 2001: Ojjci Work on Bouievatd Bridge QUEENS BOULEVARD BRIDGE: • Amtrak overhead catenary (electrical) system including • New bridge steel. new foundations and structural supports have been • New sidewalks including a walkway/bikeway separated constructed. The Amtrak catenary system has been from traffic by concrete barrier. relocated. • New and improved overhead lighting system. • South half of the bridge is closed using concrete barriers and chain-link fence for Stage 1 reconstruction. • Intelligent Transportation System (ITS) is installed. and Com.' '/ ts: • New traffic signals and traffic signs are installed as part of An Intelligent Transportation System (ITS System) has the detour plan. been installed to assist motorists in navigating through the • More than one half of the structural steel and deck slab community. As part of the ITS System: hns been removed • Nine (9) Closed Circuit TV (CCTV) cameras are installed • Existing pedestrian fence has been removed. to monitor traffic and roadway conditions. • West sidewalk has been removed. • Nine (9) Electronic Message Boards provides motorists • Existing gas main has been removed. with real-time traffic information. • Gantry crane has been erected. • More than 500 traffic signs are installed in and around the area to guide motorists. HONEYWELL STREET BRIDGE: • Plan for the deployment of Traffic Enforcement Agents has • More than one half of Amtrak overhead catenary been developed and implemented. Thirty-five (35) Traffic (electrical) steel erection system completed. Enforcement Agents per shift are strategically placed at • More than eighty percent of Protective Shielding has been various intersections to help keep a smooth flow of traffic installed. in and around the area. • Designated tow truck service is onsite to assist any motorists in need, at no cost to motorists. Improvements to the Queans Boulsvard & Honeyv/ell Street Bridges: Keeping You informed: Both bridges will undergo a complete reconstruction. Over the NYCDOT’s Community Liaison, Ms. Nareesa Nabibaksh, will course of this project, the major improvements will include; respond to all project-related inquiries and provide information • Reconstruction of concrete abutments, crash walls and about the project. Ms. Nabibaksh can be reached at (718) steel piers. 433-1687. NYCDOT will continue to issue newsletters, travel • Installation of new concrete decks and approach advisories, and project updates during the course of the pavement. project.
NEW YORK CITY NEW YORK CITY DEPARTMENT OF TRANSPORTATION EMh. Division of Bridges - Bureau of Roadway Bridges Sr 5 New York City City of New York Department of Transportation Rudolph W. Giuliani Iris Weinshall Mayor Commissioner
NYC-WTC_000267426
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000267431
Project newsletter describing reconstruction progress on Queens Boulevard and Honeywell Street Bridges
1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267429
Advance notice of phased demolition and rebuilding of bridges.
1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267433
Public update on bridge reconstruction status and schedule (NYCDOT)
1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267430
Overview of ongoing Queens Boulevard/Honeywell Street Bridge reconstruction efforts.
1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267427
Progress report on Queens Boulevard and Honeywell Street Bridge construction.
1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267428
Status update on bridge work and traffic arrangements during reconstruction.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267432
Update on bridge reconstruction scope, demolition timing, and completion schedule.
1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000415769
Traffic relief and lane reopenings on cross-town bridge.
1 shared topics · similarity 0.847
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143210
New York Times advertisement for the Children's Museum of Manhattan holiday events in November 2003.
1 shared topics · similarity 0.846
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143057
Press release announcing the launch of an EPA hotline and website for residents to request home cleaning and testing services.
1 shared topics · similarity 0.846
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar document embedding; no shared entity or topic indexed. · similarity 0.844
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412366
Transit stations opening note; no lab/inspection data.
1 shared topics · similarity 0.840
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000267431
Project newsletter describing reconstruction progress on Queens Boulevard and Honeywell Street Bridges
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267429
Advance notice of phased demolition and rebuilding of bridges.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267433
Public update on bridge reconstruction status and schedule (NYCDOT)
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267430
Overview of ongoing Queens Boulevard/Honeywell Street Bridge reconstruction efforts.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267427
Progress report on Queens Boulevard and Honeywell Street Bridge construction.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267428
Status update on bridge work and traffic arrangements during reconstruction.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000267431
Project newsletter describing reconstruction progress on Queens Boulevard and Honeywell Street Bridges
Similar indexed content
NYC-WTC_000267429
Advance notice of phased demolition and rebuilding of bridges.
Similar indexed content
NYC-WTC_000267433
Public update on bridge reconstruction status and schedule (NYCDOT)
Similar indexed content
NYC-WTC_000267430
Overview of ongoing Queens Boulevard/Honeywell Street Bridge reconstruction efforts.
Similar indexed content
NYC-WTC_000267427
Progress report on Queens Boulevard and Honeywell Street Bridge construction.
Similar indexed content