NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗Day shift labor/equipment roster for World Trade Center site.
NYC-WTC_000267312OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. i5,-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1/27/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment, CLASSIFICATION ' QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER_________________________ CAT 375 GRAPPLER 2 LABORERS 9 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15________________________________ 5 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL) 1 MECHANICS TRUCK 2 TEAMSTERS (FLATBEDS. DUMPS. AND EUKES) 14 TOOL TRUCK MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS ROLL OFF DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES: WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 light TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work:
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 _____________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA OF TOWERS . SPOT FOR MACHINES IN TOWERS______________________________________________________________ _ EXCAVATE TOWER 1 TO B 6 FOR BRIDGE EVCAVATE NORTH OF TOWER 1 TO ACCOMMODATE NEW ROAD FOR TIE BACKS. EXCAVATE EAST OF MER ROOM FOR NEW ROAD__________________________________________ LOADS OUT 108 YUKE LOADS 153_______________________________________________________________ _______ __________ DOT LOADS 81 GRACE CONTRACTIN Approved By: Title: For: SUPERlNTehrtlENT \
DAILY WORK FORCE REPORTO"27D.x!s
CITY_21MC100_008172567
NYC-WTC_000267312
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305474
Day final daily workforce and equipment at World Trade Center site, jan 27 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267319
Night preliminary daily workforce and equipment at World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269211
Day final daily workforce report for World Trade site, listing crews and machines.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305059
Day final daily workforce and equipment roster for World Trade Center project, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429412
Night shift daily workforce and equipment details for World Trade site on 1/27/02.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429411
Day shift daily workforce and equipment details for World Trade site on 1/27/02.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356568
Daily labor/equipment roster for World Trade site, Jan 26, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342317
Daily workforce and equipment listing for World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305180
Daily staffing and equipment tally for World Trade, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305474
Day final daily workforce and equipment at World Trade Center site, jan 27 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267319
Night preliminary daily workforce and equipment at World Trade Center construction.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269211
Day final daily workforce report for World Trade site, listing crews and machines.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305059
Day final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
Similar indexed content
NYC-WTC_000305474
Day final daily workforce and equipment at World Trade Center site, jan 27 2002.
Similar indexed content
NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
Similar indexed content
NYC-WTC_000267319
Night preliminary daily workforce and equipment at World Trade Center construction.
Similar indexed content
NYC-WTC_000269211
Day final daily workforce report for World Trade site, listing crews and machines.
Similar indexed content