JCC work proposal, World Trade Center Recovery, Apr 28 2002

Machine-extracted title · confidence 31%

Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.

NYC-WTC_000267055–000267057
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• Proposal Date: April 28,2002 JCC CONSTRUCTION CORP. To: BOVIS/AMEC ALLIANCE 24-02 39TH AVENUE 200 Vessey street-3 oth 11. LONG ISLAND CITY, NY 11101 City, State, Zip: New York.NY 10009 PHONE: (718)482-9600 Attention: Mr. Leonard Barone-proj.mgr. FAX:(718)482-1616 Project name: WORLD TRADE CENTE^ RECOVERY_______ We propose to furnish all material and perform all labor necessary to complete the following:

1. Remove and replace sand in playground area.

2. Remove and replace sand in volleyball court area.

3. Remove top 6" of soil in bocce court area.

4. Remove and putting greens in miniature golf area and power wash entire area.

5. Replace damaged railing along pier 25.Remove and replace all wood top handrails.power wassh entire railing and replace

damage curb as needed.

6. Excavate and remove temporary asphalt roadway.Excavate and remove all gravel under temporary roadway.Excavate

and remove of soil beneath gravel to elevation equal to bottom of the adjacent paving stonefbetween N.Moore st. & School).

7. Remove,cut and plug existing temporary roadway.

8. Remove debris,patch as needed and power wash temporary bike path.Paint lines as required to match the exsiting bike path.

9. Includes any temporary barricades,railing or fencing that may be necessary to complete the required work. 10. Power wash new stone wall along bike path.Paving stone to remain in place.

We propose to furnish material and labor, in accordance witWabove specifications, for the sum of: $572,000.00 Payments to be made as follows:

Contractor's signature: David Cannizzaro/President

Acceptance of proposal - The above price, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Owner's signature: Date;

CITY_21MC100_008170192

NYC-WTC_000267055

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000267055Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251947

Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.

Similar indexed content

Compare copies and versions →