Daily work force report, World Trade Center night shift

Machine-extracted title · confidence 37%

Night daily workforce report for World Trade Center project.

NYC-WTC_000266914
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3RACE CONTRACTING CORP. 151.45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 7, 2001 (NIGHT ) FINAL DAILY WORK FORCE REPORT ) Job Name & Location; World Trade Center Contract No. Weather Conditions J___ I Labor ___________ Equipment i CLASSIFICATION QUANT. _______ Description_______ [MANNED standby! IDLE SUPERINTENDENT 1 CAT 966 LOADER_________ 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER_________ 1 FOREMEN____________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER LABORERS___________ 17 HITACHI 750 GRAPPLER IRON WORKERS______ HITACHI 550 GRAPPLER 1 LOCAL 14_____________ £ HITACHI 550 GRAPPLER 1 LOCAL 15_____________ 8 HITACHI 1200 GRAPPLER 2 CARPENTER__________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM TEAMSTERS__________ MECHANICS TRUCK 1 MECHANICS TOOL TRUCK 1 HOUSE WRECKERS TOOL VAN II ROLL OFF_______________ DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK________ FUEL TRUCK PICKUP TRUCKS LIGHT TOWERS__________ SITE MULE______________ DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. CARGO BOXES FLAT TRUCK____________ I i 1 1 PUMP 2 ROLLER_____________ RAINMAKER/GENIE LIFT 1

Description of Work; DELAYS 750-550-375-973 DUE TO FIRE DEPT SEARCH & RECOVERY ALL NIGHT TO SIFT THROUGH DEBRIS PILES 3 TIMES_________________________________ MANNED TARPING AND TRIMMING STATIONS ________________________ MANNED WATER STATIONS FOR DUST CONTROL__________________________ 1 MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 1 [CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS [ELEVATIONS; ALL MACHINES LEVEL B-5 253 LOADS OUT 40 YUKE LOADS 43 I GRACE CONTRACTING CORP 1 Approved By: Title:_______ 6)2________ For; iSUPERINTENDENT

DAILY WORK FORCE REPORT 1207N.xls

NYC-WTC_000266914 CITY_21MC100_001571494

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266914Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →